Optimal Planning of Renovation Work in Leased Buildings under Integrated Project Delivery Method
Publisher: ASCE
Abstract: This paper presents the development of a novel model for optimizing the planning of renovation work in leased buildings that utilize the integrated project delivery (IPD) method to maximize the income of leased units during ...
Optimizing the Planning of Maintenance Activities in Education Buildings
Publisher: ASCE
Abstract: Thousands of aging education buildings in the US are in urgent need of maintenance to ensure their operational performance. The planning and scheduling of these maintenance activities need to be optimized to minimize their ...
Optimizing the Renovation Scheduling of Leased Residential Buildings to Minimize Total Project Cost
Publisher: ASCE
Abstract: This paper presents the development of a novel model for optimizing the scheduling of renovation projects for leased residential buildings. The computations of the developed model are executed using an optimization module ...