YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-10 of 11

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Dual-Based Heuristic for Optimal Cordon Pricing Design 

    Source: Journal of Transportation Engineering, Part A: Systems:;2013:;Volume ( 139 ):;issue: 011
    Author(s): Lihui Zhang; Jian Sun
    Publisher: American Society of Civil Engineers
    Abstract: This paper formulates the cordon pricing design problem with elastic demand as a mathematical program with complementarity constraints (MPCC) to simultaneously optimize the cordon locations and cordon-specific toll levels, ...
    Request PDF

    Controlling Path and Controlling Segment Analysis in Repetitive Scheduling Method 

    Source: Journal of Construction Engineering and Management:;2012:;Volume ( 138 ):;issue: 011
    Author(s): Lihui Zhang; Jianxun Qi
    Publisher: American Society of Civil Engineers
    Abstract: The controlling path and controlling segment are the basis for repetitive project scheduling. In this paper the controlling path is defined as the longest path in duration that determines the minimum project duration, ...
    Request PDF

    Hybrid Methods for Short-Term Traffic Flow Prediction Based on ARIMA-GARCH Model and Wavelet Neural Network 

    Source: Journal of Transportation Engineering, Part A: Systems:;2020:;Volume ( 146 ):;issue: 008
    Author(s): Ronghan Yao; Wensong Zhang; Lihui Zhang
    Publisher: ASCE
    Abstract: Accurate short-term traffic flow prediction is essential for real-time traffic control. A linear hybrid method and a nonlinear hybrid method for short-term traffic flow prediction are proposed with vehicle type as one ...
    Request PDF

    Multiobjective Robust Optimization Model for Generating Stable and Makespan-Protective Repetitive Schedules 

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 009:;page 04022099
    Author(s): Qiangnan Cao; Xin Zou; Lihui Zhang
    Publisher: ASCE
    Abstract: Construction projects often face various uncertainties during their execution. Even if planned project schedules are optimal with respect to time or cost, their implementation may be affected by these uncertainties, resulting ...
    Request PDF

    Low-Carbon Multiobjective Optimization for Repetitive Projects Based on Crew-Based Scheduling Strategy 

    Source: Journal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 001:;page 04024183-1
    Author(s): Zongyu Yao; Lihui Zhang; Zhilei Hua; Cheng Luo
    Publisher: American Society of Civil Engineers
    Abstract: Repetitive projects represent a significant proportion of the construction industry. Effectively reducing carbon emissions from such projects plays an important role in mitigating climate change. This study employs the ...
    Request PDF

    Genetic Algorithm–Based Method for the Deadline Problem in Repetitive Construction Projects Considering Soft Logic 

    Source: Journal of Management in Engineering:;2016:;Volume ( 032 ):;issue: 004
    Author(s): Yuansheng Huang; Xin Zou; Lihui Zhang
    Publisher: American Society of Civil Engineers
    Abstract: The discrete time-cost trade-off problem (DTCTP) is a multiobjective problem usually encountered in practical projects. Current optimization methods for this problem in repetitive construction projects often assume that ...
    Request PDF

    Improved Strategy for Resource Allocation in Repetitive Projects Considering the Learning Effect 

    Source: Journal of Construction Engineering and Management:;2014:;Volume ( 140 ):;issue: 011
    Author(s): Lihui Zhang; Xin Zou; Zhinan Kan
    Publisher: American Society of Civil Engineers
    Abstract: Considering the learning effect while planning and scheduling repetitive construction projects can help provide a realistic forecast of their duration and resource requirements. This paper has developed an improved learning ...
    Request PDF

    Criticality Comparison between the Repetitive Scheduling Method and the Network Model 

    Source: Journal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 010
    Author(s): Lihui Zhang; Chuyun Pan; Xin Zou
    Publisher: American Society of Civil Engineers
    Abstract: Although the repetitive scheduling method (RSM) is more visual and straightforward and is easier to use, the network model is more commonly accepted by both owners and contractors as a means for modeling repetitive projects. ...
    Request PDF

    Genetic Algorithm–Based Method for the Deadline Problem in Repetitive Construction Projects Considering Soft Logic 

    Source: Journal of Management in Engineering:;2016:;Volume ( 032 ):;issue: 004
    Author(s): Yuansheng Huang; Xin Zou; Lihui Zhang
    Publisher: American Society of Civil Engineers
    Abstract: The discrete time-cost trade-off problem (DTCTP) is a multiobjective problem usually encountered in practical projects. Current optimization methods for this problem in repetitive construction projects often assume that ...
    Request PDF

    Modeling and Solving the Deadline Satisfaction Problem in Line-of-Balance Scheduling 

    Source: Journal of Management in Engineering:;2018:;Volume ( 034 ):;issue: 001
    Author(s): Xin Zou; Qian Zhang; Lihui Zhang
    Publisher: American Society of Civil Engineers
    Abstract: This study investigates the deadline satisfaction problem in line-of-balance (LOB) scheduling, where each activity can be done concurrently in several units by hiring additional crews, and all employed crews are allocated ...
    Request PDF
    • 1
    • 2
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian