Search
Now showing items 1-2 of 2
Determining the Value of Standby Letter of Credit in Transfer Stage of a PPP Project to Control Concessionaire’s Opportunistic Behavior
Publisher: American Society of Civil Engineers
Abstract: Most public–private partnership (PPP) projects would be transferred back to the government at the end of the concession period. To pursue maximum profit, the concessionaire may overuse the facilities without proper maintenance ...
Dynamic Fluid-Structure Coupling Method of Flexible Flapping Wing for MAV
Publisher: American Society of Civil Engineers
Abstract: This paper presents a numerical method to simulate the dynamic interaction between the structural deformation and the aerodynamic characteristics of flexible flapping wing for micro air vehicle (MAV). A fluid-structure ...