YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-5 of 5

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Informatization Index for the Construction Industry 

    Source: Journal of Computing in Civil Engineering:;2004:;Volume ( 018 ):;issue: 003
    Author(s): Youngsoo Jung; Sangyoon Chin; Kyungrai Kim
    Publisher: American Society of Civil Engineers
    Abstract: It is normally recognized that information systems (IS) in the construction industry have not been sufficiently used in the era of information. However, so far no serious comprehensive effort has been made to measure the ...
    Request PDF

    Generate-Select-Check Based Daily Reporting System 

    Source: Journal of Computing in Civil Engineering:;2005:;Volume ( 019 ):;issue: 004
    Author(s): Sangyoon Chin; Kyungrai Kim; Yea-Sang Kim
    Publisher: American Society of Civil Engineers
    Abstract: The daily report in construction projects is an important document managed on a daily basis for collection of as-built information regarding project progress, however, its processing is time consuming, based on manual ...
    Request PDF

    Delay Analysis Method Using Delay Section 

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 011
    Author(s): Youngjae Kim; Kyungrai Kim; Dongwoo Shin
    Publisher: American Society of Civil Engineers
    Abstract: The most common cause of construction claims is delay. Moreover, delay claims are often extremely complex and difficult to resolve. For this reason, the construction industry requires an effective and reliable method for ...
    Request PDF

    Comparable Performance Measurement System for Construction Companies 

    Source: Journal of Management in Engineering:;2007:;Volume ( 023 ):;issue: 003
    Author(s): Ilhan Yu; Kyungrai Kim; Youngsoo Jung; Sangyoon Chin
    Publisher: American Society of Civil Engineers
    Abstract: The construction industry has mainly relied on financially focused performance measurements, and studies on performance measurement systems (PMSs) have been carried out at the project level. However, recently, the demand ...
    Request PDF

    Integrated Framework for Quantifying and Applying Nonworking Days to Planning and Scheduling for Determining Reasonable Construction Time 

    Source: Journal of Management in Engineering:;2022:;Volume ( 038 ):;issue: 004:;page 04022023
    Author(s): Jongsik Yoon; Kyungrai Kim; Byungjoo Choi
    Publisher: ASCE
    Abstract: Determining a reasonable construction time (RCT) is crucial in project planning and schedule management. Construction projects are exposed to the external environment, including rainfall, extreme temperatures, snowfall, ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian