YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-5 of 5

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    GA-Based Fuel-Efficient Transfer Path Selection Model for Delivering Construction Materials 

    Source: Journal of Construction Engineering and Management:;2012:;Volume ( 138 ):;issue: 006
    Author(s): Kyo-Jin Koo; Sung-Chul Park
    Publisher: American Society of Civil Engineers
    Abstract: Oil prices may continue to rise indefinitely until alternative fossil fuels or renewable energies are commercialized. In this sense, general contractors who have the responsibility of delivering construction materials ...
    Request PDF

    Construction Robot Path-Planning for Earthwork Operations 

    Source: Journal of Computing in Civil Engineering:;2003:;Volume ( 017 ):;issue: 002
    Author(s): Sung-Keun Kim; Jeffrey S. Russell; Kyo-Jin Koo
    Publisher: American Society of Civil Engineers
    Abstract: In developing an intelligent mobile construction robot, a navigation system that can provide an effective and efficient path-planning algorithm is a very important element. The purpose of a path-planning method for a mobile ...
    Request PDF

    Closure to “Construction Robot Path-Planning for Earthwork Operations” by Sung-Keun Kim, Jeffrey S. Russell, and Kyo-Jin Koo 

    Source: Journal of Computing in Civil Engineering:;2006:;Volume ( 020 ):;issue: 004
    Author(s): Sung-Keun Kim; Jeffrey S. Russell; Kyo-Jin Koo
    Publisher: American Society of Civil Engineers
    Request PDF

    Partnering Process Model for Public-Sector Fast-Track Design-Build Projects in Korea 

    Source: Journal of Management in Engineering:;2010:;Volume ( 026 ):;issue: 001
    Author(s): KyuMan Cho; ChangTaek Hyun; KyoJin Koo; TaeHoon Hong
    Publisher: American Society of Civil Engineers
    Abstract: The use of design-build project delivery in the public sector has increased rapidly since the early 1990s due to its advantages over traditional delivery methods, particularly in terms of shortening the overall project ...
    Request PDF

    Effect of Delivery Methods on Design Performance in Multifamily Housing Projects 

    Source: Journal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 007
    Author(s): ChangTaek Hyun; KyuMan Cho; KyoJin Koo; TaeHoon Hong; HyunSeok Moon
    Publisher: American Society of Civil Engineers
    Abstract: Existing studies on the performance evaluation by the delivery method generally indicate that the design build (DB) method is superior to the design-bid-build (DBB) method in terms of construction duration, cost, and ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian