YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-6 of 6

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Optimization of Bid-Winning Potential and Capital Structure for Build-Operate-Transfer Road Projects in India 

    Source: Journal of Management in Engineering:;2012:;Volume ( 028 ):;issue: 002
    Author(s): K. C. Iyer; Mohammed Sagheer
    Publisher: American Society of Civil Engineers
    Abstract: Build/Operate/Transfer (BOT) arrangement has gained wide acceptance across the world for providing public infrastructure. Such arrangements, which reallocate risks and rewards between public and private sectors, present ...
    Request PDF

    Hierarchical Structuring of PPP Risks Using Interpretative Structural Modeling 

    Source: Journal of Construction Engineering and Management:;2010:;Volume ( 136 ):;issue: 002
    Author(s): K. C. Iyer; Mohammed Sagheer
    Publisher: American Society of Civil Engineers
    Abstract: Project risk management emphasizes the need to rank and prioritize risks in a project to focus the risk management efforts. This risk prioritization is of special significance in public-private partnership (PPP) projects, ...
    Request PDF

    Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects 

    Source: Journal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 008
    Author(s): K. C. Iyer; K. N. Jha
    Publisher: American Society of Civil Engineers
    Abstract: Over 40% of Indian construction projects are facing time overrun ranging from 1 to 252 months; the reasons for which are being studied by researchers to suggest possible remedial measures. This paper identifies 55 attributes ...
    Request PDF

    Case Study on Home Office Overhead Claims 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2019:;Volume (011):;issue:003
    Author(s): K. C. Iyer;Yogita Manan Bindal
    Publisher: American Society of Civil Engineers
    Abstract: Time and cost overruns impact the parties to a contract, and often the starting point of disputes and disagreements are associated with likely damages caused by delays. The most contentious aspect related to projects getting ...
    Request PDF

    Case Study on Home Office Overhead Claims 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2019:;Volume ( 011 ):;issue: 003
    Author(s): K. C. Iyer; Yogita Manan Bindal
    Publisher: American Society of Civil Engineers
    Abstract: Time and cost overruns impact the parties to a contract, and often the starting point of disputes and disagreements are associated with likely damages caused by delays. The most contentious aspect related to projects getting ...
    Request PDF

    Influence of Extrinsic Factors on Construction Arbitrators’ Decision Making 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2019:;Volume ( 011 ):;issue: 004
    Author(s): Smita K. Patil; K. C. Iyer; N. B. Chaphalkar
    Publisher: American Society of Civil Engineers
    Abstract: The occurrence of disputes and adjudication by an arbitrator is a common feature for construction contracts in India. The decision process on a particular case ideally depends on the actual facts and evidence related to ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian