YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-10 of 16

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Noncooperative Game-Based Equilibrium Strategy to Address the Conflict between a Construction Company and Selected Suppliers 

    Source: Journal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 008
    Author(s): Jiuping Xu; Siwei Zhao
    Publisher: American Society of Civil Engineers
    Request PDF

    Control Risk for Multimode Resource-Constrained Project Scheduling Problems under Hybrid Uncertainty 

    Source: Journal of Management in Engineering:;2015:;Volume ( 031 ):;issue: 003
    Author(s): Lu Gan; Jiuping Xu
    Publisher: American Society of Civil Engineers
    Abstract: Risk control in project management has been receiving increasing attention in recent years. This paper proposes an approach based on a risk-assessment program and demonstrates how this can be extended to enhance the multimode ...
    Request PDF

    Comparative Study on the Key Issues of Postearthquake Recovery and Reconstruction Planning: Lessons from the United States, Japan, Iran, and China 

    Source: Natural Hazards Review:;2015:;Volume ( 016 ):;issue: 003
    Author(s): Yi Lu; Jiuping Xu
    Publisher: American Society of Civil Engineers
    Abstract: Frequent catastrophic earthquakes have highlighted the significance of postearthquake recovery and reconstruction (PERR) planning, a dynamic and inclusive process which encourages the building of more resilient communities. ...
    Request PDF

    Applying Optimal Control Model to Dynamic Equipment Allocation Problem: Case Study of Concrete-Faced Rockfill Dam Construction Project 

    Source: Journal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 007
    Author(s): Jiuping Xu; Ziqiang Zeng
    Publisher: American Society of Civil Engineers
    Abstract: This paper presents an optimization method for solving a dynamic equipment allocation problem (DEAP) encountered during the implementation of a concrete-faced rockfill dam construction project. In contrast to prior studies, ...
    Request PDF

    Estimation of Time for Wenchuan Earthquake Reconstruction in China 

    Source: Journal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 003
    Author(s): Caiyu Sun; Jiuping Xu
    Publisher: American Society of Civil Engineers
    Abstract: Time is considered extremely urgent in China’s Wenchuan earthquake reconstruction. However, little research has been undertaken on estimating the time needed for reconstruction in China, especially for this specific ...
    Request PDF

    Suggestions for Temporary Construction Facilities’ Layout Problems in Large-Scale Construction Projects 

    Source: Journal of Construction Engineering and Management:;2014:;Volume ( 140 ):;issue: 005
    Author(s): Jiuping Xu; Xiaoling Song
    Publisher: American Society of Civil Engineers
    Abstract: Temporary construction facilities’ layout problems (TCFLPs) are crucial in large-scale construction projects. Well-designed TCFLPs can improve overall effectiveness and facilitate an efficient construction process. This ...
    Request PDF

    Applying Multiobjective Bilevel Optimization under Fuzzy Random Environment to Traffic Assignment Problem: Case Study of a Large-Scale Construction Project 

    Source: Journal of Infrastructure Systems:;2014:;Volume ( 020 ):;issue: 003
    Author(s): Jiuping Xu; Yan Tu; Xiao Lei
    Publisher: American Society of Civil Engineers
    Abstract: This article presents an optimization method for solving a material flow traffic assignment problem (TAP) in a large-scale construction project considering a hierarchical structure with fuzzy random variables. A multiobjective ...
    Request PDF

    Hybrid Nested Particle Swarm Optimization for a Waste Load Allocation Problem in River System 

    Source: Journal of Water Resources Planning and Management:;2016:;Volume ( 142 ):;issue: 007
    Author(s): Jiuping Xu; Mengxiang Zhang; Ziqiang Zeng
    Publisher: American Society of Civil Engineers
    Abstract: The aim of this article is to develop a hybrid nested particle swarm optimization to solve a Pigovian tax-based waste load allocation problem for river systems. The river system at the Tuojiang River basin is the prototype ...
    Request PDF

    Reverse Logistics Network-Based Multiperiod Optimization for Construction and Demolition Waste Disposal 

    Source: Journal of Construction Engineering and Management:;2019:;Volume ( 145 ):;issue: 002
    Author(s): Jiuping Xu; Yi Shi; Siwei Zhao
    Publisher: American Society of Civil Engineers
    Abstract: Environmental pollution and resource consumption caused by construction and demolition waste (CDW) have become increasingly serious. As a result, it is urgent to focus on waste recycling, resource conservation, and ...
    Request PDF

    Bilevel Optimization of Regional Water Resources Allocation Problem under Fuzzy Random Environment 

    Source: Journal of Water Resources Planning and Management:;2013:;Volume ( 139 ):;issue: 003
    Author(s): Jiuping Xu; Yan Tu; Ziqiang Zeng
    Publisher: American Society of Civil Engineers
    Abstract: The allocation of water resources has long been recognized as a critical optimization problem. In this study, a bilevel programming model with fuzzy random variables is developed for tackling a regional water resources ...
    Request PDF
    • 1
    • 2
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian