Search
Now showing items 1-2 of 2
Long-Term Equilibrium Operational Plan for Hydro-PV Hybrid Power System Considering Benefits, Stability, and Tolerance
Publisher: ASCE
Abstract: Due to the volatility, intermittency and, randomness of photovoltaic (PV) power output, hydropower is utilized as a complementary power source. The largest grid-connected hydro-PV power station, the Longyangxia project, ...
Estimating Maximal Annual Energy Given Heterogeneous Hydropower Generating Units with Application to the Three Gorges System
Publisher: American Society of Civil Engineers
Abstract: A hierarchical optimization method is presented for an assessment of the potential maximum energy output of the Three Gorges Project and Gezhouba cascade hydropower stations in China. The optimization incorporates a detailed ...