Development of Automatic-Extraction Model of Poisonous Clauses in International Construction Contracts Using Rule-Based NLP
Publisher: American Society of Civil Engineers
Abstract: As construction projects have significantly increased in size and become more complicated, the number of claims and dispute cases between participating parties during the construction work have been continuously increasing. ...
Uncertainties Prevailing in Construction Bid Documents and Their Impact on Project Pricing through the Analysis of Prebid Requests for Information
Publisher: ASCE
Abstract: Construction bid documents may contain uncertain or incomplete information that can affect project pricing as well as project performance, if not addressed prior to bidding. To resolve the uncertainties and clarify project ...
Establishment of Growth Strategies for International Construction Firms by Exploring Diversification-Related Determinants and Their Effects
Publisher: American Society of Civil Engineers
Effective Risk Positioning through Automated Identification of Missing Contract Conditions from the Contractor’s Perspective Based on FIDIC Contract Cases
Publisher: ASCE
Abstract: Defining, measuring, and dealing with contractual risks are crucial for successful construction projects because the contractual risks can lead to serious claims and disputes. In general, construction participants make a ...
Natural Language Processing–Driven Similar Project Determination Using Project Scope Statements
Publisher: ASCE
Abstract: Learning from previous projects in light of benchmarking criteria is a desirable and popular approach to reliable project development and planning in the preconstruction phase. Previous similar projects serve as a practical ...
Project Requirements Prioritization through NLP-Driven Classification and Adjusted Work Items Analysis
Publisher: ASCE
Abstract: Project requirements indicate specific works, events, or conditions that should be fulfilled to ensure the construction project success within planned budgets and times. To effectively manage project requirements, requirement ...
Proof-of-Concept Study for Model-Based Construction Safety Diagnosis and Management Driven by Prevention through Design
Publisher: ASCE
Abstract: The primary objective of this research is to demonstrate the feasibility of a model-based construction safety assessment system using building information modeling (BIM) and diagnosing accident-prone BIM objects through ...
Quantifying Project Uncertainties: Leveraging Historical Bid and Change Order Data for Automated Detection of Cost and Schedule Impacts in New Projects
Publisher: American Society of Civil Engineers
Abstract: Unexpected uncertainties often arise during construction project execution, impacting performance measures such as time, budget, scope, and quality. This study addresses these cost and schedule challenges by creating an ...