YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-10 of 13

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Smart Garage Development Problem: Model Formulation and Solution Approach 

    Source: Journal of Infrastructure Systems:;2012:;Volume ( 018 ):;issue: 002
    Author(s): Seok Kim; Ivan Damnjanovic
    Publisher: American Society of Civil Engineers
    Abstract: Plug-in electric vehicles (PEVs) are becoming increasingly popular. In the next several years, all major vehicle manufacturers will introduce PEVs, either as battery electric vehicles (BEVs), such as the Nissan Leaf, or ...
    Request PDF

    Determination of Required Falling Weight Deflectometer Testing Frequency for Pavement Structural Evaluation at the Network Level 

    Source: Journal of Transportation Engineering, Part A: Systems:;2006:;Volume ( 132 ):;issue: 001
    Author(s): Ivan Damnjanovic; Zhanmin Zhang
    Publisher: American Society of Civil Engineers
    Abstract: Recently, a structural condition index (SCI) was developed for the Texas Department of Transportation as a screening tool to discriminate between pavements that need structural reinforcement from those that do not. For the ...
    Request PDF

    Applying Method of Moments to Model Reliability of Pavements Infrastructure 

    Source: Journal of Transportation Engineering, Part A: Systems:;2006:;Volume ( 132 ):;issue: 005
    Author(s): Zhanmin Zhang; Ivan Damnjanović
    Publisher: American Society of Civil Engineers
    Abstract: Even though the concepts of pavement reliability and risk-based design have been recognized for a long time, probabilistic pavement design methods are often limited to the application of Monte Carlo simulation or Taylor ...
    Request PDF

    The Resource-Based View on Project Risk Management 

    Source: Journal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 009
    Author(s): Paul Govan; Ivan Damnjanovic
    Publisher: American Society of Civil Engineers
    Abstract: The benefits of conducting risk analyses in the planning of construction projects are widely acknowledged. However, the actual implementation of procedures notably differs significantly across industry segments. Even within ...
    Request PDF

    Risk-Based Model for Valuation of Performance-Specified Pavement Maintenance Contracts 

    Source: Journal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 007
    Author(s): Ivan Damnjanovic; Zhanmin Zhang
    Publisher: American Society of Civil Engineers
    Abstract: Many transportation agencies have started outsourcing maintenance activities to contractors by means of performance-based contracts. These outsourcing contracts are intended to transfer performance-based risk from ...
    Request PDF

    Structural Network Measures for Risk Assessment of Construction Projects 

    Source: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering:;2020:;Volume ( 006 ):;issue: 001
    Author(s): Paul Govan; Ivan Damnjanovic
    Publisher: ASCE
    Abstract: Risk assessment is an integral part of project management; however, its implementation is often challenging. One of the key challenges is how to collect reliable data for modeling risks. The objective of this paper is to ...
    Request PDF

    Effects of Pavement Spatial Variability on Contractor’s Management Strategies 

    Source: Journal of Infrastructure Systems:;2010:;Volume ( 016 ):;issue: 004
    Author(s): Seok Kim; Ivan Damnjanovic; Molly Gunby
    Publisher: American Society of Civil Engineers
    Abstract: Performance-based maintenance contracts are becoming an increasingly popular method of outsourcing pavement maintenance work. These contracts transfer performance-related risks to contractors with the objective of reducing ...
    Request PDF

    Optimal Pipeline Maintenance Strategies in the United States: Stochastic Reliability Analysis of Gas Pipeline Network Failures 

    Source: Journal of Pipeline Systems Engineering and Practice:;2020:;Volume ( 011 ):;issue: 001
    Author(s): Sharareh Kermanshachi; Behzad Rouhanizadeh; Mustafa M. Cobanoglu; Ivan Damnjanovic
    Publisher: ASCE
    Abstract: The increasing number of corrosion-based incidents in pipeline systems within recent decades has encouraged decision makers to focus on predicting when pipelines will fail, and to improve maintenance strategies. Policymakers ...
    Request PDF

    Network Theory–Driven Construction Logic Knowledge Network: Process Modeling and Application in Highway Projects 

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 010:;page 04021114-1
    Author(s): Chau Le; H. David Jeong; Ivan Damnjanovic
    Publisher: ASCE
    Abstract: Determining a reasonable project duration is one of the most critical activities required by project owner agencies for successful project letting and delivery. Most owner agencies, specifically in the highway sector, ...
    Request PDF

    Sequential Machine Learning for Activity Sequence Prediction from Daily Work Report Data 

    Source: Journal of Construction Engineering and Management:;2023:;Volume ( 149 ):;issue: 009:;page 04023082-1
    Author(s): Hamed Alikhani; Chau Le; H. David Jeong; Ivan Damnjanovic
    Publisher: ASCE
    Abstract: It is critical for project owners to have a reasonable estimation of project duration before the letting date for contract time determination and project management purposes. To determine the project duration, highway ...
    Request PDF
    • 1
    • 2
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian