YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-10 of 10

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Distribution-Free Monte Carlo Simulation: Premise and Refinement 

    Source: Journal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 005
    Author(s): I-Tung Yang
    Publisher: American Society of Civil Engineers
    Abstract: From cost estimation to reliability analysis, Monte Carlo simulation has found its niche in a wide variety of applications in civil engineering. With recognition of correlations among variables, recent efforts have been ...
    Request PDF

    Using Elitist Particle Swarm Optimization to Facilitate Bicriterion Time-Cost Trade-Off Analysis 

    Source: Journal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 007
    Author(s): I-Tung Yang
    Publisher: American Society of Civil Engineers
    Abstract: The present study develops a new optimization algorithm to find the complete time-cost profile (Pareto front) over a set of feasible project durations, i.e., it solves the time-cost trade-off problem. To improve existing ...
    Request PDF

    Chance-Constrained Time–Cost Tradeoff Analysis Considering Funding Variability 

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 009
    Author(s): I-Tung Yang
    Publisher: American Society of Civil Engineers
    Abstract: This paper proposes a chance-constrained programming model to incorporate the variability of funding, which is quantified by the coefficient of variation. The proposed model formulates financial feasibility as a stochastic ...
    Request PDF

    Repetitive Scheduling Method: Requirements, Modeling, and Implementation 

    Source: Journal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 005
    Author(s): Photios G. Ioannou; I-Tung Yang
    Publisher: American Society of Civil Engineers
    Abstract: Projects with repeating activities, such as multistory buildings and highways, present unique scheduling challenges. This paper presents the necessary requirements that scheduling systems should address to meet the needs ...
    Request PDF

    Discussion of “Algorithm for Determining Controlling Path Considering Resource Continuity” by Mohammad A. Ammar and Emad Elbeltagi 

    Source: Journal of Computing in Civil Engineering:;2003:;Volume ( 017 ):;issue: 001
    Author(s): Photios G. Ioannou; I-Tung Yang
    Publisher: American Society of Civil Engineers
    Request PDF

    Workers' Comp. Premiums: Disparities in Penalties for Identical Losses 

    Source: Journal of Construction Engineering and Management:;1997:;Volume ( 123 ):;issue: 003
    Author(s): John G. Everett; I-Tung Yang
    Publisher: American Society of Civil Engineers
    Abstract: Workers' compensation insurance (WCI) is one of the largest controllable costs for construction contractors. A fixed portion of the WCI standard premium is determined by the individual contractor's company characteristics, ...
    Request PDF

    Repetitive Scheduling Method: Requirements, Modeling, and Implementation 

    Source: Journal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 005
    Author(s): Photios G. Ioannou; I-Tung Yang
    Publisher: American Society of Civil Engineers
    Abstract: Projects with repeating activities, such as multistory buildings and highways, present unique scheduling challenges. This paper presents the necessary requirements that scheduling systems should address to meet the needs ...
    Request PDF

    Discussion of “Comparison of Linear Scheduling Model and Repetitive Scheduling Method” by Kris G. Mattila and Amy Park 

    Source: Journal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 003
    Author(s): Photios G. Ioannou; I-Tung Yang
    Publisher: American Society of Civil Engineers
    Request PDF

    Parallel Computing Platform for Multiobjective Simulation Optimization of Bridge Maintenance Planning 

    Source: Journal of Construction Engineering and Management:;2012:;Volume ( 138 ):;issue: 002
    Author(s): I-Tung Yang; Yo-Ming Hsieh; Li-Ou Kung
    Publisher: American Society of Civil Engineers
    Abstract: The maintenance planning of deteriorating bridges is to find a balance between obtained performance and incurred cost. Because the planning horizon spans tens of years, a certain amount of uncertainty is inherent in ...
    Request PDF

    Use of Support Vector Regression to Improve Computational Efficiency of Stochastic Time-Cost Trade-Off 

    Source: Journal of Construction Engineering and Management:;2014:;Volume ( 140 ):;issue: 001
    Author(s): I-Tung Yang; Yu-Cheng Lin; Hsin-Yun Lee
    Publisher: American Society of Civil Engineers
    Abstract: Stochastic time-cost trade-off has been a popular object of investigation in past decades because there are uncertain factors that can be considered when determining the appropriate trade-off between project completion ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian