Search
Now showing items 1-6 of 6
Customer Earned Value: Performance Indicator from Flow and Value Generation View
Publisher: American Society of Civil Engineers
Abstract: The earned value method (EVM) is considered an advanced project control technique that provides a quantitative measure of work performance. However, the EVM is effective only under the assumption that every activity is ...
Automated Lifting System Integrated with Construction Hoists for Table Formwork in Tall Buildings
Publisher: American Society of Civil Engineers
Abstract: In tall-building construction, the equipment-driven table formwork method is a useful alternative for improving productivity of horizontal formwork with less skilled labor. The lifting system significantly affects the ...
Advanced Steel Beam Assembly Approach for Improving Safety of Structural Steel Workers
Publisher: American Society of Civil Engineers
Abstract: This study describes an advanced steel beam assembly approach to improve the safety of structural steel workers compared with that of the conventional process in construction. The approach uses a self-supported steel joint ...
Case Study of the Core Structure Succeeding Method for Tall Building Construction
Publisher: American Society of Civil Engineers
Advanced Steel Beam Assembly Approach for Improving Safety of Structural Steel Workers
Publisher: American Society of Civil Engineers
Abstract: This study describes an advanced steel beam assembly approach to improve the safety of structural steel workers compared with that of the conventional process in construction. The approach uses a self-supported steel joint ...
Simulation-Based Lift Planning Model for the Lift Transfer Operation System
Publisher: ASCE
Abstract: Producing adequate lift plans for a transfer operation system (TOS) used in irregularly shaped high-rise building constructions is a more complex task than for an all-floor lift operation system. In the TOS, a resource ...