YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-10 of 10

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Impact of Age on the Strength of Experience and Education Role in Fatal Injuries Prevention in Iranian Construction Craft Workers 

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 007
    Author(s): Hossein Karimi; Hosein Taghaddos
    Publisher: ASCE
    Abstract: Over the past two decades, the construction industry has encountered the challenge of rapid aging of craft workers in many countries. In addition, the shortage of skilled workers that has emerged over the past three decades ...
    Request PDF

    BIM-Based Maintenance Management System for Healthcare Facilities 

    Source: Journal of Performance of Constructed Facilities:;2021:;Volume ( 035 ):;issue: 004:;page 04021036-1
    Author(s): Zahra Kamal; Hosein Taghaddos; Hossein Karimi
    Publisher: ASCE
    Abstract: The reliable maintenance management system of medical equipment influences the patients’ treatment and the hospitals’ performance. Although building information modeling (BIM) technology has evolved the construction industry, ...
    Request PDF

    Influence of Repair on Corrosion-Failure Modes of Square-RC Columns Located in Tidal Zone 

    Source: Journal of Performance of Constructed Facilities:;2020:;Volume ( 034 ):;issue: 004
    Author(s): Atiye Farahani; Hosein Taghaddos; Mohammad Shekarchi
    Publisher: ASCE
    Abstract: Chloride-induced corrosion is the main cause of premature deterioration and failure of RC structures in corrosive environments. Therefore, modeling chloride permeation and investigating different methods for the repair and ...
    Request PDF

    Optimized Mobile Crane Path Planning in Discretized Polar Space 

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 005:;page 04021036-1
    Author(s): Ali Mousaei; Hosein Taghaddos; Ala Nekouvaght Tak; Saeed Behzadipour; Ulrich Hermann
    Publisher: ASCE
    Abstract: Improper planning and management of heavy lifts is a major cause of cost overruns, delays, and, more importantly, safety incidents in industrial megaprojects. Automated lift planning is widely acknowledged as an effective ...
    Request PDF

    An Integrated Framework for Operation and Maintenance of Gas Utility Pipeline Using BIM, GIS, and AR 

    Source: Journal of Performance of Constructed Facilities:;2022:;Volume ( 036 ):;issue: 003:;page 04022023
    Author(s): Amir Shekargoftar; Hosein Taghaddos; Amir Azodi; Ala Nekouvaght Tak; Khashayar Ghorab
    Publisher: ASCE
    Abstract: To maintain underground utilities in a safe condition, the need for a comprehensive management and maintenance system is becoming more prominent. There are several problems with the current operation maintenance applications ...
    Request PDF

    Optimizing Heavy Lift Plans for Industrial Construction Sites Using Dijkstra’s Algorithm 

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 011:;page 04021160-1
    Author(s): Ali Mousaei; Hosein Taghaddos; S. Marzieh Bagheri; Ulrich Hermann
    Publisher: ASCE
    Abstract: Planning lift activities of mobile cranes for a modular project can raise productivity and improve safety. An optimized lift plan is essential for multiple lifts due to high rental cost of heavy lift cranes. However, ...
    Request PDF

    Simulation-Based Multiagent Approach for Scheduling Modular Construction 

    Source: Journal of Computing in Civil Engineering:;2014:;Volume ( 028 ):;issue: 002
    Author(s): Hosein Taghaddos; Ulrich Hermann; Simaan AbouRizk; Yasser Mohamed
    Publisher: American Society of Civil Engineers
    Abstract: Modular construction is a common practice for building industrial plants, particularly in the oil sands region of Alberta, Canada. Each module is a project with its own activities and constraints. These modules are ...
    Request PDF

    Evaluating Mobile Crane Lift Operations Using an Interactive Virtual Reality System 

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 011:;page 04021154-1
    Author(s): Shiva Pooladvand; Hosein Taghaddos; Arash Eslami; Ala Nekouvaght Tak; Ulrich (Rick) Hermann
    Publisher: ASCE
    Abstract: Cranes are one of the most critical and expensive pieces of construction industry equipment requiring intense safety considerations. Lifting crews should attempt to develop an effective lift plan to improve the operation’s ...
    Request PDF

    Automated Method for Checking Crane Paths for Heavy Lifts in Industrial Projects 

    Source: Journal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 010
    Author(s): Zhen Lei; Hosein Taghaddos; Jacek Olearczyk; Mohamed Al-Hussein; Ulrich Hermann
    Publisher: American Society of Civil Engineers
    Abstract: At present, industrial projects are constructed primarily using a prefabricated approach. The modules are produced in an off-site facility and transported on transport trailers to the construction site where they are lifted ...
    Request PDF

    Algorithm for Mobile Crane Walking Path Planning in Congested Industrial Plants 

    Source: Journal of Construction Engineering and Management:;2015:;Volume ( 141 ):;issue: 002
    Author(s): Zhen Lei; SangHyeok Han; Ahmed Bouferguène; Hosein Taghaddos; Ulrich Hermann; Mohamed Al-Hussein
    Publisher: American Society of Civil Engineers
    Abstract: On-site construction of industrial projects relies heavily on large mobile cranes for the lifting of prefabricated modules, which over the years have become heavier and more voluminous. Industrial construction sites are ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian