YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-3 of 3

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Incorporating Social Benefits in Concession Price Negotiation for Public–Private Partnership Contracts 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2022:;Volume ( 015 ):;issue: 001:;page 04522040-1
    Author(s): Hongyu Jin; Chunlu Liu
    Publisher: ASCE
    Abstract: Public–private partnership (PPP) has become the most popular contract agreement form for infrastructure projects. To fully enjoy the benefits of PPP contracting, the value of the concession price should be carefully ...
    Request PDF

    Research on Near-Miss Incidents Monitoring and Early Warning System for Building Construction Sites Based on Blockchain Technology 

    Source: Journal of Construction Engineering and Management:;2023:;Volume ( 149 ):;issue: 012:;page 04023124-1
    Author(s): Meng Li; Qi Lin; Hongyu Jin
    Publisher: ASCE
    Abstract: With the expansion of the scale of construction projects, the safety situation of construction projects has become more and more severe, and strengthening near-miss event management can effectively improve the safety ...
    Request PDF

    Imperfect Information Bargaining Model for Determining Concession Period of PPPs under Revenue Uncertainty 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 002
    Author(s): Hongyu Jin; Shijing Liu; Jun Li; Chunlu Liu
    Publisher: ASCE
    Abstract: The concession period is a critical contractual parameters for public-private partnership (PPP) projects whose value can significantly influence the financial interests of project participants. However, it has become a ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian