Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling
Publisher: American Society of Civil Engineers
Abstract: An ant colony optimization (ACO)-based methodology for solving a multimode resource-constrained project scheduling problem (MRCPSP) with the objective of minimizing project duration is presented. With regards to the need ...
Closure to “Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling” by Hong Zhang
Publisher: American Society of Civil Engineers
Discrete-Event Simulation for Estimating Emissions from Construction Processes
Publisher: American Society of Civil Engineers
Abstract: Whereas estimating emissions from construction processes is crucial to evaluating emission-reduction plans, current approaches can only estimate emissions from an average rather than operational perspective due to an ...
Simulation-Based Estimation of Fuel Consumption and Emissions of Asphalt Paving Operations
Publisher: American Society of Civil Engineers
Abstract: Although energy saving and emission reduction are crucial for sustainable construction, asphalt paving operations are seldom evaluated in terms of fuel consumption and emissions. Current methods for estimating fuel consumption ...
Computer Vision–Based Disruption Management for Prefabricated Building Construction Schedule
Publisher: ASCE
Abstract: Prefabricated building construction (PBC) projects are prone to schedule delays and budget overruns due to disruptions. Hence it is necessary to timely detect and evaluate disruptions and respond in order to put a disrupted ...
Wind Tunnel Test on Cable Dome of Geiger Type
Publisher: The American Society of Mechanical Engineers (ASME)
Abstract: This paper presents preliminary results of an aeroelastic wind tunnel test on a cable dome. The structural design of the model is given in detail. Similarity requirements based on dimensional ...
Particle Swarm Optimization for Construction Site Unequal-Area Layout
Publisher: American Society of Civil Engineers
Abstract: Layout of temporary facilities on a construction site is essential to enhancing productivity and safety, and is a complex issue due to the unique nature of construction. This paper proposes a particle swarm optimization ...
Permutation-Based Particle Swarm Optimization for Resource-Constrained Project Scheduling
Publisher: American Society of Civil Engineers
Abstract: In the light of particle swarm optimization (PSO) which utilizes both local and global experiences during search process, a permutation-based scheme for the resource-constrained project scheduling problem (RCPSP) is ...
Activity Object-Oriented Simulation Strategy for Modeling Construction Operations
Publisher: American Society of Civil Engineers
Abstract: The application of an object-oriented (OO) approach including the OO modeling concept and the OO programming mechanisms to develop an activity object-oriented (AOO) simulation strategy for modeling construction operations ...
Particle Swarm Optimization for Preemptive Scheduling under Break and Resource-Constraints
Publisher: American Society of Civil Engineers
Abstract: This paper introduces a particle swarm optimization (PSO)-based methodology to implement preemptive scheduling under break and resource-constraints (PSBRC) for construction projects. The PSBRC under study allows the ...