YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-10 of 35

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Natural Language Processing–Driven Model to Extract Contract Change Reasons and Altered Work Items for Advanced Retrieval of Change Orders 

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 011:;page 04021147-1
    Author(s): Taewoo Ko; H. David Jeong; Ghang Lee
    Publisher: ASCE
    Abstract: Change orders are documents that describe a specific contract amendment to the original scope of work. Historical change orders are invaluable information sources that can provide practical and proven solutions for developing ...
    Request PDF

    Determining Highway Project Contract Time from Project Duration Estimates 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2023:;Volume ( 015 ):;issue: 003:;page 04523019-1
    Author(s): Chau Le; H. David Jeong
    Publisher: American Society of Civil Engineers
    Abstract: Contract time determination (CTD) by state DOTs is critical to a typical design-bid-build project due to its profound impacts on stakeholders in various aspects, such as the actual amount of time allocated to the contractor, ...
    Request PDF

    Acceptance Sampling Plans for Pipeline Condition Assessment 

    Source: Journal of Pipeline Systems Engineering and Practice:;2019:;Volume ( 010 ):;issue: 004
    Author(s): Myungjin Chae; H. David Jeong
    Publisher: American Society of Civil Engineers
    Abstract: Pipeline condition data collection and assessment is the first step for strategic infrastructure asset management and planning. However, since condition data collection and assessment is a highly expensive and time-consuming ...
    Request PDF

    NLP-Based Approach to Semantic Classification of Heterogeneous Transportation Asset Data Terminology 

    Source: Journal of Computing in Civil Engineering:;2017:;Volume ( 031 ):;issue: 006
    Author(s): Tuyen Le; H. David Jeong
    Publisher: American Society of Civil Engineers
    Abstract: The inconsistency of data terminology has imposed big challenges on integrating transportation project data from distinct sources. Differences in meaning of data elements may lead to miscommunication between data senders ...
    Request PDF

    Framework for Integrating and Assessing Highway Infrastructure Data 

    Source: Journal of Management in Engineering:;2016:;Volume ( 032 ):;issue: 001
    Author(s): Asregedew Woldesenbet; H. David Jeong; Heedae Park
    Publisher: American Society of Civil Engineers
    Abstract: State highway agencies invest a large amount of resources in collecting, storing, and managing various types of data, ranging from roadway inventory to pavement condition data, during the life cycle of a highway infrastructure ...
    Request PDF

    Holistic Performance Evaluation of Highway Design-Build Projects 

    Source: Journal of Management in Engineering:;2020:;Volume ( 036 ):;issue: 004
    Author(s): Kunhee Choi; Inwoo Jung; Yangtian Yin; Charles Gurganus; H. David Jeong
    Publisher: ASCE
    Abstract: Many state transportation agencies (STAs) have adopted alternative contracting methods, including design-build (DB) contracting, to accelerate construction. Although DB has become increasingly common in recent years, very ...
    Request PDF

    Estimating Preconstruction Services for Bridge Design Projects 

    Source: Journal of Management in Engineering:;2020:;Volume ( 036 ):;issue: 004
    Author(s): Ahmed Abdelaty; K. Joseph Shrestha; H. David Jeong
    Publisher: ASCE
    Abstract: Preconstruction services play a vital role in ensuring timely approval of infrastructure funds and successful execution of construction projects. Most state DOTs use simple methods such as a percentage of estimated ...
    Request PDF

    Improving the Accuracy of Early Cost Estimates on Transportation Infrastructure Projects 

    Source: Journal of Management in Engineering:;2020:;Volume ( 036 ):;issue: 005
    Author(s): Ilker Karaca; Douglas D. Gransberg; H. David Jeong
    Publisher: ASCE
    Abstract: A better understanding of top-down estimating practices and their contribution to budgeting accuracy allows public transportation agencies to allocate limited construction funds more efficiently. This paper builds on a ...
    Request PDF

    Network Theory–Driven Construction Logic Knowledge Network: Process Modeling and Application in Highway Projects 

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 010:;page 04021114-1
    Author(s): Chau Le; H. David Jeong; Ivan Damnjanovic
    Publisher: ASCE
    Abstract: Determining a reasonable project duration is one of the most critical activities required by project owner agencies for successful project letting and delivery. Most owner agencies, specifically in the highway sector, ...
    Request PDF

    Pareto Principle in Scoping-Phase Cost Estimating: A Multiobjective Optimization Approach for Selecting and Applying Optimal Major Work Items 

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 008:;page 04022076
    Author(s): Chau Le; H. David Jeong; Ivan Damnjanovic; Satish Bukkapatnam
    Publisher: ASCE
    Abstract: Cost estimation is critical to a typical transportation project’s development process. Specifically, project owners use cost estimates during the scoping phase to set project budgets for funding approval and cost management. ...
    Request PDF
    • 1
    • 2
    • 3
    • 4
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian