YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-5 of 5

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Alignment during Preproject Planning 

    Source: Journal of Management in Engineering:;2001:;Volume ( 017 ):;issue: 002
    Author(s): A. F. Griffith; G. E. Gibson Jr.
    Publisher: American Society of Civil Engineers
    Abstract: Many projects suffer when project participants are in disagreement as to the proper success emphasis or goals for the project. These differences in success emphasis are a result of poor team alignment. Alignment can be ...
    Request PDF

    Benchmarking Preproject Planning Effort 

    Source: Journal of Management in Engineering:;1996:;Volume ( 012 ):;issue: 002
    Author(s): M. R. Hamilton; G. E. Gibson Jr.
    Publisher: American Society of Civil Engineers
    Abstract: Benchmarking key performance areas is key to continual improvement of processes. This paper focuses on measurement and benchmarking of the preproject-planning process for capital construction. While experienced members of ...
    Request PDF

    Closure to “Constructability in Public Sector” by G. E. Gibson Jr. and C. I. McGinnis 

    Source: Journal of Construction Engineering and Management:;1997:;Volume ( 123 ):;issue: 004
    Author(s): G. E. Gibson, Jr.; C. I. McGinnis
    Publisher: American Society of Civil Engineers
    Request PDF

    Constructability in Public Sector 

    Source: Journal of Construction Engineering and Management:;1996:;Volume ( 122 ):;issue: 003
    Author(s): G. E. Gibson, Jr.; C. I. McGinnis; W. S. Flanigan; J. E. Wood
    Publisher: American Society of Civil Engineers
    Abstract: Constructability is defined as the optimum use of construction knowledge and experience in planning, design, procurement, and field operations to achieve overall project objectives. It should ideally be started early in ...
    Request PDF

    Preproject-Planning Process for Capital Facilities 

    Source: Journal of Construction Engineering and Management:;1995:;Volume ( 121 ):;issue: 003
    Author(s): G. E. Gibson Jr.; J. H. Kaczmarowski; H. E. Lore Jr.
    Publisher: American Society of Civil Engineers
    Abstract: Preproject planning is defined as the process of developing sufficient strategic information for owners to address risk and decide whether to commit resources to maximize the change for a successful capital facility ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian