YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-2 of 2

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Factors Underpinning the Successful Return of Public–Private Partnership Projects to Public Authority: Assessing the Critical Success Factors of the Transfer Phase of Chinese Water Projects 

    Source: Journal of Infrastructure Systems:;2023:;Volume ( 029 ):;issue: 002:;page 04023015-1
    Author(s): Fengyu Bao; Chuan Chen; Igor Martek; Albert P. C. Chan; Weiling Jiang
    Publisher: American Society of Civil Engineers
    Abstract: In China, public–private partnership (PPP) projects consist of six phases, from inception to completion. In the final phase, known as the transfer phase (TP), the project assets are transferred back to the government, and ...
    Request PDF

    Critical Risks Inherent to the Transfer Phase of Public–Private Partnership Water Projects in China 

    Source: Journal of Management in Engineering:;2022:;Volume ( 038 ):;issue: 003:;page 04022006
    Author(s): Fengyu Bao; Igor Martek; Chuan Chen; Qihong Wu; Albert P. C. Chan
    Publisher: ASCE
    Abstract: Public–private partnership (PPP) infrastructure projects progress through separate phases, with each phase subject to unique risks, thereby requiring a phase-based strategy for managing risks. To date, most research on PPP ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian