Public–Private Partnership Risks in Conflict Zones and Solutions: Case Study for Afghanistan
Publisher: ASCE
Abstract: Insufficient studies on public–private partnership (PPP) risks in conflict zones, and thus lack of knowledge to provide effective and feasible solutions to these risks, are the major reasons for the failure of PPP ...
Performance Analysis of Alternative Contracting Methods for Highway Construction Projects: Case Study for Iran
Publisher: ASCE
Abstract: The suitability of the project delivery system (PDS) selected for a project greatly influences the efficiency of project implementation. In Iran, traditional design-bid-build (DBB) is commonly used for highway construction ...
Modeling the Relationship between Critical BIM Attributes and Environmental Sustainability Criteria Using PLS-SEM Technique
Publisher: ASCE
Abstract: Applying the concepts of sustainability to reduce energy waste and environmental pollution in architecture has created a topic called sustainable architecture with an environmental approach. In recent years, the demand for ...
BIM-Based Combination of Takt Time and Discrete Event Simulation for Implementing Just in Time in Construction Scheduling under Constraints
Publisher: ASCE
Abstract: Because of the complexity of construction projects, the use of building information modeling (BIM) has become a more efficient solution. The main problems with conventional methods, such as the critical path method and ...
Selecting the Most Appropriate Project Manager to Improve the Performance of the Occupational Groups in Road Construction Projects in Warm Regions
Publisher: ASCE
Abstract: This research proposes a framework to determine the most appropriate project manager (PM) to enhance the performance of occupational groups (POGs) in large, medium, and small road construction projects in warm regions. The ...
Environmental Impact Profiles for Glazing Systems: Strategies for Early Design Process
Publisher: American Society of Civil Engineers
Abstract: The most crucial architectural design stage is the early design phase, when most of the critical decisions are made. To address the significance of this stage, the design team is obliged to rapidly evaluate many design ...
Exploring the Causes of Delays in Construction Industry Using a Cause-and-Effect Diagram: Case Study for Iran
Publisher: ASCE
Abstract: Delays in achieving projects' objectives according to the planned schedule are considered one of the main sources of conflicts in Iran's construction industry. A precise and structured methodology and baseline to properly ...
Providing a Model to Select an Optimum Multifamily Housing Method in Iran
Publisher: American Society of Civil Engineers
Root Cause Analysis of the Most Frequent Claims in the Building Industry through the SCoP<sub>3</sub>E Ishikawa Diagram
Publisher: American Society of Civil Engineers
Abstract: If the expectations of the project parties are not met, costly legal claims can ensue. Claims are unpredictable, so identifying the most common claims from past experiences and their root-causes could be a sound policy for ...