YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-4 of 4

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Quantitative Definition of Projects Impacted by Change Orders 

    Source: Journal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 001
    Author(s): Awad S. Hanna; Richard Camlic; Pehr A. Peterson; Erik V. Nordheim
    Publisher: American Society of Civil Engineers
    Abstract: Change, defined as any event that results in a modification of the original scope, execution time, or cost of work, is inevitable on most construction projects due to the uniqueness of each project and the limited resources ...
    Request PDF

    Impact of Change Orders on Labor Efficiency for Mechanical Construction 

    Source: Journal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 003
    Author(s): Awad S. Hanna; Jeffrey S. Russell; Timothy W. Gotzion; Erik V. Nordheim
    Publisher: American Society of Civil Engineers
    Abstract: Change orders have become an everyday occurrence in construction. It is widely accepted by both owners and contractors that change orders have an effect on the labor efficiency, but these effects are difficult to quantify ...
    Request PDF

    Impact of Change Orders on Labor Efficiency for Electrical Construction 

    Source: Journal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 004
    Author(s): Awad S. Hanna; Jeffrey S. Russell; Erik V. Nordheim; Matthew J. Bruggink
    Publisher: American Society of Civil Engineers
    Abstract: Change orders are a source of many disputes in today's construction industry. The issue at hand is whether or not the execution of change orders work has a negative impact on overall labor efficiency on a construction ...
    Request PDF

    Indicator Variables Model of Firm’s Size-Profitability Relationship of Electrical Contractors Using Financial and Economic Data 

    Source: Journal of Construction Engineering and Management:;2003:;Volume ( 129 ):;issue: 002
    Author(s): Abdurahman Ammar; Awad S. Hanna; Erik V. Nordheim; Jeffrey S. Russell
    Publisher: American Society of Civil Engineers
    Abstract: According to some electrical contractors who are members of the Federated Electrical Contractors, electrical contractor firms may experience a lack of profitability as the firm grows in size. Under these conditions, ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian