Search
Now showing items 1-3 of 3
Risk-Response Strategy Optimization Considering Limited Risk-Related Resource Allocation and Scheduling
Publisher: ASCE
Abstract: Effective handling of project risks is an important part of project risk management. Various methods have been proposed to determine the optimal set of risk-response actions (RRAs) to mitigate the project risks. However, ...
Advanced Monte Carlo Methods and Applications
Publisher: American Society of Civil Engineers
Gaussian Fields for Predicting Drift of Oil and Gas Pipes
Publisher: ASCE
Abstract: In the oil and gas industry, empirical models are used to estimate the drift of pipes. These models encode pipe geometrical features, measured along the pipe length. If the estimated drift does not meet the operability ...
CSV
RIS