YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-7 of 7

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Synthesizing Ontology and Graph Neural Network to Unveil the Implicit Rules for US Bridge Preservation Decisions 

    Source: Journal of Management in Engineering:;2024:;Volume ( 040 ):;issue: 003:;page 04024007-1
    Author(s): Chuanni He; Min Liu; Simon M. Hsiang; Nicholas Pierce
    Abstract: Bridges are essential portions of a nation’s infrastructure systems. Although general rules and guidelines are available for bridge preservation activity prediction, due to the intricate interdependencies among bridge ...
    Request PDF

    Enriched Construction Regulation Inquiry Responses: A Hybrid Search Approach for Large Language Models 

    Source: Journal of Management in Engineering:;2025:;Volume ( 041 ):;issue: 003:;page 04025001-1
    Author(s): Chuanni He; Weilin He; Min Liu; Shaolong Leng; Song Wei
    Publisher: American Society of Civil Engineers
    Abstract: The applicability of existing automated compliance check tools in construction is limited, as they are insufficient to provide end-to-end responses given the fragmented and unstructured compliance checking requirements in ...
    Request PDF

    Space–Time–Workforce Visualization and Conditional Capacity Synthesis in Uncertainty 

    Source: Journal of Management in Engineering:;2023:;Volume ( 039 ):;issue: 002:;page 04022071-1
    Author(s): Chuanni He; Min Liu; Yuxiang Zhang; Zhigao Wang; Simon M. Hsiang; Gongfan Chen; Weiqiang Li; Gongfu Dai
    Publisher: American Society of Civil Engineers
    Abstract: Workspace, project duration, and workforce are three critical resources for construction projects. Project managers need to expend time and effort reviewing, comprehending, and coordinating these resources. However, the ...
    Request PDF

    Using Images to Detect, Plan, Analyze, and Coordinate a Smart Contract in Construction 

    Source: Journal of Management in Engineering:;2023:;Volume ( 039 ):;issue: 002:;page 04023002-1
    Author(s): Gongfan Chen; Min Liu; YuXiang Zhang; ZhiGao Wang; Simon M. Hsiang; Chuanni He
    Publisher: American Society of Civil Engineers
    Abstract: Reliable construction workflow relies on timely discovery, analysis, and checking of compliance with contract terms, which are time consuming and inefficient tasks. Smart contracts enabled by blockchain technology have ...
    Request PDF

    Improving Construction Meeting Effectiveness: Trade-Offs between Reactive and Proactive Site-Level Planning Discussions 

    Source: Journal of Management in Engineering:;2024:;Volume ( 040 ):;issue: 005:;page 04024029-1
    Author(s): Ashtad Javanmardi; Min Liu; Chuanni He; Simon M. Hsiang; Alireza Abbasian-Hosseini
    Publisher: American Society of Civil Engineers
    Abstract: Despite the adage “hope for the best, plan for the worst,” site-level proactive plans produced by construction planning meetings show planning for the best. Planning meetings comprise both proactive and reactive discussions. ...
    Request PDF

    An Ontological Knowledge-Driven Smart Contract Framework for Implicit Bridge Preservation Decision Making 

    Source: Journal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 004:;page 04025008-1
    Author(s): Chuanni He; Min Liu; Simon M. Hsiang; Nicholas Pierce; Samuel Megahed; Asa Godfrey
    Publisher: American Society of Civil Engineers
    Abstract: The decision-making for bridge preservation constitutes two types of rules: explicit rules, which are based on clear specifications to establish an overall baseline preservation plan, and implicit rules, which are rooted ...
    Request PDF

    Exploit Social Distancing in Construction Scheduling: Visualize and Optimize Space–Time–Workforce Tradeoff 

    Source: Journal of Management in Engineering:;2022:;Volume ( 038 ):;issue: 004:;page 04022027
    Author(s): Chuanni He; Min Liu; YuXiang Zhang; Zhigao Wang; Simon M. Hsiang; Gongfan Chen; Jiang Chen
    Publisher: ASCE
    Abstract: The COVID pandemic has given rise to the necessity of social distancing regulations, which has brought the importance of workspace management on the construction site to an unprecedented level. Understanding and visualizing ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian