Search
Now showing items 1-3 of 3
Multiobjective Optimization Model for Planning Repetitive Construction Projects
Publisher: ASCE
Abstract: Minimizing the duration of repetitive construction projects such as high-rise buildings and highway construction often requires interrupting the work continuity of construction crews and/or utilizing overtime hours. Available ...
Optimal Planning of Renovation Work in Leased Buildings under Integrated Project Delivery Method
Publisher: ASCE
Abstract: This paper presents the development of a novel model for optimizing the planning of renovation work in leased buildings that utilize the integrated project delivery (IPD) method to maximize the income of leased units during ...
Optimizing the Renovation Scheduling of Leased Residential Buildings to Minimize Total Project Cost
Publisher: ASCE
Abstract: This paper presents the development of a novel model for optimizing the scheduling of renovation projects for leased residential buildings. The computations of the developed model are executed using an optimization module ...