YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-3 of 3

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Impact of Personal Demographics on Civil Engineers’ Motivators: Case Study of Turkey 

    Source: Journal of Management in Engineering:;2016:;Volume ( 032 ):;issue: 002
    Author(s): Atilla Damci
    Publisher: American Society of Civil Engineers
    Abstract: A civil engineer who lacks motivation, may perform poorly in making decisions, which may in turn negatively affect the performance of a construction project. This study extends knowledge about individual-level motivation ...
    Request PDF

    Multiresource Leveling in Line-of-Balance Scheduling 

    Source: Journal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 009
    Author(s): Atilla Damci; David Arditi; Gul Polat
    Publisher: American Society of Civil Engineers
    Abstract: Line-of-balance (LOB) methodology produces a work schedule in which resource allocation is automatically performed to provide a continuous and uninterrupted use of resources, but the distribution of resources could be ...
    Request PDF

    Optimum Finance-Based Scheduling 

    Source: Journal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 009:;page 04024104-1
    Author(s): Firat Dogu Akin; Atilla Damci; David Arditi
    Publisher: American Society of Civil Engineers
    Abstract: Even though advanced heuristic and metaheuristic models have been developed for minimizing financing cost by using total float to adjust the start times of activities, these models overlook the fact that the attempt to ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian