Search
Now showing items 1-3 of 3
Cooling Time Estimation of Newly Placed Hot-Mix Asphalt Pavement in Different Weather Conditions
Publisher: American Society of Civil Engineers
Abstract: In hot-mix asphalt (HMA) pavement construction, newly placed pavement must be sufficiently cooled before it can be opened to traffic. Estimation of the time required for pavement to reach a desired temperature level is ...
Characterization of the Distress Modes and In Situ Material Properties of Highway Asphalt Pavement with Long Service Life
Publisher: American Society of Civil Engineers
Abstract: A 36-year-old, heavily trafficked highway asphalt pavement was analyzed in detail. The variation in structural capacity was assessed by a falling-weight deflectometer (FWD). Trenches were cut to examine the distresses in ...
Characterization of the Distress Modes and In Situ Material Properties of Highway Asphalt Pavement with Long Service Life
Publisher: American Society of Civil Engineers
Abstract: A 36-year-old, heavily trafficked highway asphalt pavement was analyzed in detail. The variation in structural capacity was assessed by a falling-weight deflectometer (FWD). Trenches were cut to examine the distresses in ...