Expert System for Compactor Selection
Publisher: American Society of Civil Engineers
Abstract: This paper describes an expert system that helps the construction or highway engineer choose the most appropriate compactor under a set of job conditions. Selecting the suitable compactor is affected by numerous field ...
Modeling Uncertainty in Operations with Nonstationary Cycle Times
Publisher: American Society of Civil Engineers
Abstract: This paper describes an approach for probabilistic analysis of construction operations in which nonstationary cycle times have a major impact on production. A nonstationary cycle time is defined as a cycle time that varies ...
Discussion of “<i>Current Float Techniques for Resources Scheduling</i>” by Venayagampillai Shanmuganayagam (September, 1989, Vol. 115, No. 3)
Publisher: American Society of Civil Engineers
Integration of Simulation with Expert Systems
Publisher: American Society of Civil Engineers
Abstract: This paper investigates the integration of simulation with expert systems. Several recent engineering research projects in this field are described. Relevant research in construction is discussed and potential benefits of ...
Probabilistic Approach for Budgeting in Portfolio of Projects
Publisher: American Society of Civil Engineers
Abstract: This paper presents a mathematical model for calculating the budgetary impact of increasing the required confidence level in a probabilistic risk assessment for a portfolio of projects. The model provides a rational approach ...
Probabilistic Cost Estimating with Subjective Correlations
Publisher: American Society of Civil Engineers
Abstract: One of the difficulties in probabilistic estimating is accounting for the existing correlations among cost components modeled as random variables. Even if the estimator is aware of the existence of correlations among random ...
Probabilistic Model for Tunneling Project Using Markov Chain
Publisher: American Society of Civil Engineers
Abstract: Actual tunnel advance rates from the Outfall Tunnel of the Boston Harbor Cleanup Project are analyzed. It is shown that states of work and nonwork for the tunnel boring machine can be modeled with a Markov chain. A general ...
Closure to “<i>Integration of Simulation with Expert Systems</i>” by Ali Touran (September, 1990, Vol. 116, No. 3)
Publisher: American Society of Civil Engineers
Probabilistic Model for Cost Contingency
Publisher: American Society of Civil Engineers
Abstract: This paper proposes a probabilistic model for the calculation of project cost contingency by considering the expected number of changes and the average cost of change. The model assumes a Poisson arrival pattern for change ...
Alternative Project Delivery Systems: Applications and Legal Limits in Transportation Projects
Publisher: American Society of Civil Engineers
Abstract: This paper presents the results of a comprehensive survey of the legal codes of all the 50 states in the United States regarding alternative project delivery systems in transportation projects. In the past decade there has ...