YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-4 of 4

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Problems Facing Parties Involved in Build, Operate, and Transport Projects in Egypt 

    Source: Journal of Management in Engineering:;2002:;Volume ( 018 ):;issue: 004
    Author(s): Mohamed M. Askar; Ahmed A. Gab-Allah
    Publisher: American Society of Civil Engineers
    Abstract: One of the newest financial schemes for environmental projects is the Build, Operate, and Transfer (BOT) concept, which is being used increasingly worldwide as a project delivery system by which governments obtain the ...
    Request PDF

    Value Engineering in Egyptian Bridge Construction 

    Source: Journal of Construction Engineering and Management:;1991:;Volume ( 117 ):;issue: 003
    Author(s): Ismail M. Basha; Ahmed A. Gab‐Allah
    Publisher: American Society of Civil Engineers
    Abstract: During the past two decades, various construction systems have been applied in building several highway bridges and elevated roads in Egypt. This paper deals with the use of value engineering principles to evaluate the ...
    Request PDF

    Finance-Based Scheduling of Construction Projects Using Integer Programming 

    Source: Journal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 001
    Author(s): Ashraf M. Elazouni; Ahmed A. Gab-Allah
    Publisher: American Society of Civil Engineers
    Abstract: Construction scheduling is the process of devising schemes for sequencing activities. A realistic schedule fulfills the real concerns of users, thus minimizing the chances of schedule failure. The minimization of total ...
    Request PDF

    Construction of Ameria Caisson in Egypt 

    Source: Journal of Construction Engineering and Management:;1995:;Volume ( 121 ):;issue: 001
    Author(s): Ismail M. Basha; Ahmed A. Gab-Allah; Mohamed I. Amer
    Publisher: American Society of Civil Engineers
    Abstract: The Ameria Tunnel Pumping Station (ATPS) is the main pumping station of the Greater Cairo Wastewater Project. The objective of ATPS is to lift the wastewater for a vertical distance of 32.0 m (from the collection tunnel ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian