YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Variable Pressure Peaking Boiler, Operation, Testing, and Control

    Source: Journal of Engineering for Gas Turbines and Power:;1975:;volume( 097 ):;issue: 003::page 435
    Author:
    E. G. Lansing
    DOI: 10.1115/1.3446027
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: During the last few years many utilities have been purchasing fossil fueled power plants designed to be used for initial or future cycling service. As more large nuclear units are placed in service with their low incremental operating cost, it is anticipated that many fossil units will be operated to meet daily cycling load demands while still retaining the ability to efficiently supply a large amount of the system base load, if it is required. This paper discusses the operation and control of a gas and oil fired variable pressure drum boiler specified and designed for peaking operation at a major U. S. utility company. Operating results obtained during normal unit shutdowns, startups for morning peak load, and rapid, variable, and constant pressure load changes are presented. Also discussed are the major control system features employed for variable pressure operation as well as operation of the superheater by-pass system. The advantages of variable pressure operation are pointed out and explained along with supporting operational data.
    keyword(s): Pressure , Boilers , Testing , Stress , Public utilities , Power stations , Superheaters , Peak load AND Control systems ,
    • Download: (801.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Variable Pressure Peaking Boiler, Operation, Testing, and Control

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/87417
    Collections
    • Journal of Engineering for Gas Turbines and Power

    Show full item record

    contributor authorE. G. Lansing
    date accessioned2017-05-08T22:58:30Z
    date available2017-05-08T22:58:30Z
    date copyrightJuly, 1975
    date issued1975
    identifier issn1528-8919
    identifier otherJETPEZ-26719#435_1.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/87417
    description abstractDuring the last few years many utilities have been purchasing fossil fueled power plants designed to be used for initial or future cycling service. As more large nuclear units are placed in service with their low incremental operating cost, it is anticipated that many fossil units will be operated to meet daily cycling load demands while still retaining the ability to efficiently supply a large amount of the system base load, if it is required. This paper discusses the operation and control of a gas and oil fired variable pressure drum boiler specified and designed for peaking operation at a major U. S. utility company. Operating results obtained during normal unit shutdowns, startups for morning peak load, and rapid, variable, and constant pressure load changes are presented. Also discussed are the major control system features employed for variable pressure operation as well as operation of the superheater by-pass system. The advantages of variable pressure operation are pointed out and explained along with supporting operational data.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleVariable Pressure Peaking Boiler, Operation, Testing, and Control
    typeJournal Paper
    journal volume97
    journal issue3
    journal titleJournal of Engineering for Gas Turbines and Power
    identifier doi10.1115/1.3446027
    journal fristpage435
    journal lastpage440
    identifier eissn0742-4795
    keywordsPressure
    keywordsBoilers
    keywordsTesting
    keywordsStress
    keywordsPublic utilities
    keywordsPower stations
    keywordsSuperheaters
    keywordsPeak load AND Control systems
    treeJournal of Engineering for Gas Turbines and Power:;1975:;volume( 097 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian