YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Partnering: Why Project Owner-Contractor Relationships Change

    Source: Journal of Construction Engineering and Management:;2000:;Volume ( 126 ):;issue: 004
    Author:
    John A. Drexler Jr.
    ,
    Erik W. Larson
    DOI: 10.1061/(ASCE)0733-9364(2000)126:4(293)
    Publisher: American Society of Civil Engineers
    Abstract: Over the last decade, research in the construction industry has explored the owner-contractor relationship in project management resulting in a different paradigm called partnering. Partnering is a relationship characterized by cooperation and collaboration in contrast to the adversarial relationship more commonly experienced between owners and contractors. This study utilized data collected from 276 construction projects to examine the stability in the owner-contractor relationship. Owner-contractor relationships were classified as being adversarial, guarded adversarial, informal partners, or project partners. Fifty-eight percent of the projects experienced some fundamental change in working relationship—either positive or negative. Projects that began as formal partnerships were the most stable with over two thirds ending as they began. Guarded adversarial was the least stable with fewer than 30% maintaining this kind of relationship at the end of the project. Content analysis of the reasons stated for the change revealed factors that contribute to an improvement or deterioration in working relationships. The writers use this analysis to make recommendations for sustaining and improving partnerships between owner and contractors.
    • Download: (49.82Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Partnering: Why Project Owner-Contractor Relationships Change

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/86512
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorJohn A. Drexler Jr.
    contributor authorErik W. Larson
    date accessioned2017-05-08T22:41:18Z
    date available2017-05-08T22:41:18Z
    date copyrightJuly 2000
    date issued2000
    identifier other%28asce%290733-9364%282000%29126%3A4%28293%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/86512
    description abstractOver the last decade, research in the construction industry has explored the owner-contractor relationship in project management resulting in a different paradigm called partnering. Partnering is a relationship characterized by cooperation and collaboration in contrast to the adversarial relationship more commonly experienced between owners and contractors. This study utilized data collected from 276 construction projects to examine the stability in the owner-contractor relationship. Owner-contractor relationships were classified as being adversarial, guarded adversarial, informal partners, or project partners. Fifty-eight percent of the projects experienced some fundamental change in working relationship—either positive or negative. Projects that began as formal partnerships were the most stable with over two thirds ending as they began. Guarded adversarial was the least stable with fewer than 30% maintaining this kind of relationship at the end of the project. Content analysis of the reasons stated for the change revealed factors that contribute to an improvement or deterioration in working relationships. The writers use this analysis to make recommendations for sustaining and improving partnerships between owner and contractors.
    publisherAmerican Society of Civil Engineers
    titlePartnering: Why Project Owner-Contractor Relationships Change
    typeJournal Paper
    journal volume126
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2000)126:4(293)
    treeJournal of Construction Engineering and Management:;2000:;Volume ( 126 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian