YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Modification of Minimum Moment Approach in Resource Leveling

    Source: Journal of Construction Engineering and Management:;2000:;Volume ( 126 ):;issue: 004
    Author:
    Mohammed A. Salem Hiyassat
    DOI: 10.1061/(ASCE)0733-9364(2000)126:4(278)
    Publisher: American Society of Civil Engineers
    Abstract: This paper proposes a modification to the minimum moment approach that is used for resource leveling as presented by Harris and based upon the critical path method. The proposed and the traditional methods were developed with the assumption of no activity splitting and a fixed project duration with unlimited availability of resources. The difference between these methods is in the criteria of selecting the activity that has to be shifted from its original position to a better position. This is judged by the change in the statical moment of the resource histogram before and after such movement. In the proposed method, and for the activities that lie at the same sequence step, the activity that is to be shifted first is selected based upon both the value of its free float (
    • Download: (160.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Modification of Minimum Moment Approach in Resource Leveling

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/86489
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMohammed A. Salem Hiyassat
    date accessioned2017-05-08T22:41:17Z
    date available2017-05-08T22:41:17Z
    date copyrightJuly 2000
    date issued2000
    identifier other%28asce%290733-9364%282000%29126%3A4%28278%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/86489
    description abstractThis paper proposes a modification to the minimum moment approach that is used for resource leveling as presented by Harris and based upon the critical path method. The proposed and the traditional methods were developed with the assumption of no activity splitting and a fixed project duration with unlimited availability of resources. The difference between these methods is in the criteria of selecting the activity that has to be shifted from its original position to a better position. This is judged by the change in the statical moment of the resource histogram before and after such movement. In the proposed method, and for the activities that lie at the same sequence step, the activity that is to be shifted first is selected based upon both the value of its free float (
    publisherAmerican Society of Civil Engineers
    titleModification of Minimum Moment Approach in Resource Leveling
    typeJournal Paper
    journal volume126
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2000)126:4(278)
    treeJournal of Construction Engineering and Management:;2000:;Volume ( 126 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian