YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    U.S. Construction Labor Productivity Trends, 1970–1998

    Source: Journal of Construction Engineering and Management:;2000:;Volume ( 126 ):;issue: 002
    Author:
    Eric Allmon
    ,
    Carl T. Haas
    ,
    John D. Borcherding
    ,
    Paul M. Goodrum
    DOI: 10.1061/(ASCE)0733-9364(2000)126:2(97)
    Publisher: American Society of Civil Engineers
    Abstract: Construction productivity trends carry immense consequences for the economy as a whole. However, there is little scholarly consensus concerning even the direction of such trends. The main objectives of this paper are to (1) present an approach to studying long-term productivity trends in the U.S. construction industry; and (2) provide a preliminary indication of such trends over the past 25–30 years. Subsequent, extended statistical studies are suggested that may be based on the approach of the selected work presented here. Labor cost and output productivity trends are tracked for tasks that represent different trades and differing levels of technological intensity within the building construction sector. Specific tasks dealt with a range from a zero technology impact task, such as hand trenching, to compaction with a sheepsfoot roller. Means's cost manuals were used to trace the benchmark values for these tasks. These values reflect productivity trends. Unit labor costs in constant dollars and daily output factors were compared over decades for each task. Direct work rate data from 72 projects in Austin, Tex., over the last 25 years were also examined. Increasing the direct work rate usually increases construction productivity. The combined data indicate that productivity has increased in the 1980s and 1990s. Depressed real wages and technological advances appear to be the two biggest reasons for this increase. The data also indicate that management practices were not a leading contributor to construction productivity changes over time. Subsequent studies are required to add weight to these observations and can be based on the approach presented here.
    • Download: (177.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      U.S. Construction Labor Productivity Trends, 1970–1998

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/86334
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorEric Allmon
    contributor authorCarl T. Haas
    contributor authorJohn D. Borcherding
    contributor authorPaul M. Goodrum
    date accessioned2017-05-08T22:41:01Z
    date available2017-05-08T22:41:01Z
    date copyrightMarch 2000
    date issued2000
    identifier other%28asce%290733-9364%282000%29126%3A2%2897%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/86334
    description abstractConstruction productivity trends carry immense consequences for the economy as a whole. However, there is little scholarly consensus concerning even the direction of such trends. The main objectives of this paper are to (1) present an approach to studying long-term productivity trends in the U.S. construction industry; and (2) provide a preliminary indication of such trends over the past 25–30 years. Subsequent, extended statistical studies are suggested that may be based on the approach of the selected work presented here. Labor cost and output productivity trends are tracked for tasks that represent different trades and differing levels of technological intensity within the building construction sector. Specific tasks dealt with a range from a zero technology impact task, such as hand trenching, to compaction with a sheepsfoot roller. Means's cost manuals were used to trace the benchmark values for these tasks. These values reflect productivity trends. Unit labor costs in constant dollars and daily output factors were compared over decades for each task. Direct work rate data from 72 projects in Austin, Tex., over the last 25 years were also examined. Increasing the direct work rate usually increases construction productivity. The combined data indicate that productivity has increased in the 1980s and 1990s. Depressed real wages and technological advances appear to be the two biggest reasons for this increase. The data also indicate that management practices were not a leading contributor to construction productivity changes over time. Subsequent studies are required to add weight to these observations and can be based on the approach presented here.
    publisherAmerican Society of Civil Engineers
    titleU.S. Construction Labor Productivity Trends, 1970–1998
    typeJournal Paper
    journal volume126
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2000)126:2(97)
    treeJournal of Construction Engineering and Management:;2000:;Volume ( 126 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian