contributor authorH. Randolph Thomas
contributor authorDavid R. Riley
contributor authorVictor E. Sanvido
date accessioned2017-05-08T22:39:40Z
date available2017-05-08T22:39:40Z
date copyrightJanuary 1999
date issued1999
identifier other%28asce%290733-9364%281999%29125%3A1%2839%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/85478
description abstractThis paper describes three structural steel erection projects that used different methods of delivering the structural steel members. Two projects scheduled daily deliveries. On one project, steel was erected directly from the truck. On the second project, steel was off-loaded, sorted, and then erected. On the third project, three bulk deliveries of steel were made. The steel was stored wherever space was available, and sorting was done as the steel was erected. The differences in labor productivity are quantified using the multiple regression technique. The analysis shows that the most efficient delivery method is to erect the steel directly from the truck. Double-handling, as was done on the second project, resulted in a loss of productivity of about 9%. Indiscriminate deliveries resulted in a loss of productivity of about 16%. The effects of weather are also quantified. Significant losses of productivity occurred because of snow (41%) and cold temperatures (32%).
publisherAmerican Society of Civil Engineers
titleLoss of Labor Productivity due to Delivery Methods and Weather
typeJournal Paper
journal volume125
journal issue1
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1999)125:1(39)
treeJournal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 001
contenttypeFulltext