YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Incentive/Disincentive Contracts: Perceptions of Owners and Contractors

    Source: Journal of Construction Engineering and Management:;1998:;Volume ( 124 ):;issue: 005
    Author:
    David Arditi
    ,
    Firuzan Yasamis
    DOI: 10.1061/(ASCE)0733-9364(1998)124:5(361)
    Publisher: American Society of Civil Engineers
    Abstract: Incentive/disincentive (I/D) contracting has developed from basic cost- and profit-sharing arrangements between an owner and a contractor. To motivate the contractor to put in an extra effort to realize one or more project objectives of an accelerated, costly, and complex undertaking, the owner may offer an award to the contractor. The owner may also threaten the contractor with a penalty if the objectives are not met. This paper reviews the fundamental incentive/disincentive arrangements in contracting literature. Then, results are reported of a survey conducted on a sample of Illinois DOT highway contracts that included I/D provisions. The survey investigates whether there exists an agreement or disagreement between IDOT's and the contractors' perceptions of I/D contract provisions. The findings reveal how I/D contract milestones are established, how they are executed, what kind of work practices the contractor uses to fulfill I/D targets, and how the contracting parties perceive I/D contracts' effectiveness as opposed to non-I/D contracts. Certain issues pointed out by the respondents as problematic and in need of further refinement in I/D applications are also highlighted.
    • Download: (1.669Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Incentive/Disincentive Contracts: Perceptions of Owners and Contractors

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/85234
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorDavid Arditi
    contributor authorFiruzan Yasamis
    date accessioned2017-05-08T22:39:19Z
    date available2017-05-08T22:39:19Z
    date copyrightSeptember 1998
    date issued1998
    identifier other%28asce%290733-9364%281998%29124%3A5%28361%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/85234
    description abstractIncentive/disincentive (I/D) contracting has developed from basic cost- and profit-sharing arrangements between an owner and a contractor. To motivate the contractor to put in an extra effort to realize one or more project objectives of an accelerated, costly, and complex undertaking, the owner may offer an award to the contractor. The owner may also threaten the contractor with a penalty if the objectives are not met. This paper reviews the fundamental incentive/disincentive arrangements in contracting literature. Then, results are reported of a survey conducted on a sample of Illinois DOT highway contracts that included I/D provisions. The survey investigates whether there exists an agreement or disagreement between IDOT's and the contractors' perceptions of I/D contract provisions. The findings reveal how I/D contract milestones are established, how they are executed, what kind of work practices the contractor uses to fulfill I/D targets, and how the contracting parties perceive I/D contracts' effectiveness as opposed to non-I/D contracts. Certain issues pointed out by the respondents as problematic and in need of further refinement in I/D applications are also highlighted.
    publisherAmerican Society of Civil Engineers
    titleIncentive/Disincentive Contracts: Perceptions of Owners and Contractors
    typeJournal Paper
    journal volume124
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1998)124:5(361)
    treeJournal of Construction Engineering and Management:;1998:;Volume ( 124 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian