YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Concurrent Construction and Life Cycle Project Management

    Source: Journal of Construction Engineering and Management:;1997:;Volume ( 123 ):;issue: 004
    Author:
    A. Jaafari
    DOI: 10.1061/(ASCE)0733-9364(1997)123:4(427)
    Publisher: American Society of Civil Engineers
    Abstract: This paper investigates “concurrent construction” and its potential application in life cycle management of capital projects. The construction industry is under pressure to reduce project delivery times and costs despite increased uncertainties, ambiguities, and complexities that surround today's projects. Concurrent construction may well hold the key to success on this front. Concurrent construction is based on integrating all project phases into a single phase. It starts with the definition of a product model and division of the project into major parts or systems accordingly. Each part or system is entrusted to a team consisting of members drawn from the relevant disciplines as well as the contractor. The delivery of a specific part is carried out by the relevant team in an integrated fashion in a single phase. While the potential benefits of concurrent construction are beyond doubt, current contractual, organizational, and work method barriers militate against realizing these. However, there are workable solutions to these problems. This paper covers examples of approaches that could overcome these barriers.
    • Download: (1.416Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Concurrent Construction and Life Cycle Project Management

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/84689
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorA. Jaafari
    date accessioned2017-05-08T22:38:26Z
    date available2017-05-08T22:38:26Z
    date copyrightDecember 1997
    date issued1997
    identifier other%28asce%290733-9364%281997%29123%3A4%28427%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/84689
    description abstractThis paper investigates “concurrent construction” and its potential application in life cycle management of capital projects. The construction industry is under pressure to reduce project delivery times and costs despite increased uncertainties, ambiguities, and complexities that surround today's projects. Concurrent construction may well hold the key to success on this front. Concurrent construction is based on integrating all project phases into a single phase. It starts with the definition of a product model and division of the project into major parts or systems accordingly. Each part or system is entrusted to a team consisting of members drawn from the relevant disciplines as well as the contractor. The delivery of a specific part is carried out by the relevant team in an integrated fashion in a single phase. While the potential benefits of concurrent construction are beyond doubt, current contractual, organizational, and work method barriers militate against realizing these. However, there are workable solutions to these problems. This paper covers examples of approaches that could overcome these barriers.
    publisherAmerican Society of Civil Engineers
    titleConcurrent Construction and Life Cycle Project Management
    typeJournal Paper
    journal volume123
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1997)123:4(427)
    treeJournal of Construction Engineering and Management:;1997:;Volume ( 123 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian