YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Parametric Constraint Management in Planning and Scheduling: Computational Basis

    Source: Journal of Construction Engineering and Management:;1997:;Volume ( 123 ):;issue: 003
    Author:
    Hossam El-Bibany
    DOI: 10.1061/(ASCE)0733-9364(1997)123:3(348)
    Publisher: American Society of Civil Engineers
    Abstract: Critical path methods (CPM) have long been used as the computational basis for computer scheduling systems. The basic computational methodology in CPM proved to be inadequate to represent and integrate more problems in project management. The main reason is that the methodology is built on a computational procedure that is specific to the underlying network representation. Various knowledge-based techniques have been used to provide a richer computational methodology. The main goal of this paper is to describe the computational basis of a constraint-management methodology as applied to planning and scheduling. Each problem may be represented by interrelating its parameters using construction duration and precedence knowledge. The parameter relationships may be viewed as mathematical constraints. The paper provides a description of the computational methodology including the constraint modeling process, the graph representation of constraints, and the evaluation of constraint networks. The methodology may result in multiple solutions based on the nature of graph representation. Therefore, the paper proceeds to prove that only the acceptable computational solution represents the appropriate project plan and schedule. The paper concludes by commenting on the utility of the methodology and providing directions for future research.
    • Download: (669.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Parametric Constraint Management in Planning and Scheduling: Computational Basis

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/84589
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorHossam El-Bibany
    date accessioned2017-05-08T22:38:17Z
    date available2017-05-08T22:38:17Z
    date copyrightSeptember 1997
    date issued1997
    identifier other%28asce%290733-9364%281997%29123%3A3%28348%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/84589
    description abstractCritical path methods (CPM) have long been used as the computational basis for computer scheduling systems. The basic computational methodology in CPM proved to be inadequate to represent and integrate more problems in project management. The main reason is that the methodology is built on a computational procedure that is specific to the underlying network representation. Various knowledge-based techniques have been used to provide a richer computational methodology. The main goal of this paper is to describe the computational basis of a constraint-management methodology as applied to planning and scheduling. Each problem may be represented by interrelating its parameters using construction duration and precedence knowledge. The parameter relationships may be viewed as mathematical constraints. The paper provides a description of the computational methodology including the constraint modeling process, the graph representation of constraints, and the evaluation of constraint networks. The methodology may result in multiple solutions based on the nature of graph representation. Therefore, the paper proceeds to prove that only the acceptable computational solution represents the appropriate project plan and schedule. The paper concludes by commenting on the utility of the methodology and providing directions for future research.
    publisherAmerican Society of Civil Engineers
    titleParametric Constraint Management in Planning and Scheduling: Computational Basis
    typeJournal Paper
    journal volume123
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1997)123:3(348)
    treeJournal of Construction Engineering and Management:;1997:;Volume ( 123 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian