YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Continuous Assessment of Project Performance

    Source: Journal of Construction Engineering and Management:;1997:;Volume ( 123 ):;issue: 001
    Author:
    Jeffrey S. Russell
    ,
    Edward J. Jaselskis
    ,
    Samuel P. Lawrence
    DOI: 10.1061/(ASCE)0733-9364(1997)123:1(64)
    Publisher: American Society of Civil Engineers
    Abstract: Project managers for owners, designers, and contractors need real-time information to assist them in managing projects. This paper describes a process whereby owner, engineer, and construction contractor organizations can use continuous or time-dependent variables (e.g., owner expenditures, construction effort hours expended) to predict project outcomes from start of detailed design through construction completion. Continuous variable data were collected on 54 construction projects. S-curves were developed for two project outcome categories: (1) “successful” (meeting or exceeding budget and schedule expectations); and (2) “less-than-successful” (not meeting budget and/or schedule expectations of the owner). Statistical analysis was performed to identify those variables showing a statistically significant difference between the two project outcome categories. Variables exhibiting a significant difference between the S-curves for “successful” and “less-than-successful” projects can be used as predictors of project outcome. Results show that different variables were predictors of success at different points of time during the project life cycle. Practical applications of these results along with limitations and future research are described.
    • Download: (1.051Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Continuous Assessment of Project Performance

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/84156
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorJeffrey S. Russell
    contributor authorEdward J. Jaselskis
    contributor authorSamuel P. Lawrence
    date accessioned2017-05-08T22:37:29Z
    date available2017-05-08T22:37:29Z
    date copyrightMarch 1997
    date issued1997
    identifier other%28asce%290733-9364%281997%29123%3A1%2864%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/84156
    description abstractProject managers for owners, designers, and contractors need real-time information to assist them in managing projects. This paper describes a process whereby owner, engineer, and construction contractor organizations can use continuous or time-dependent variables (e.g., owner expenditures, construction effort hours expended) to predict project outcomes from start of detailed design through construction completion. Continuous variable data were collected on 54 construction projects. S-curves were developed for two project outcome categories: (1) “successful” (meeting or exceeding budget and schedule expectations); and (2) “less-than-successful” (not meeting budget and/or schedule expectations of the owner). Statistical analysis was performed to identify those variables showing a statistically significant difference between the two project outcome categories. Variables exhibiting a significant difference between the S-curves for “successful” and “less-than-successful” projects can be used as predictors of project outcome. Results show that different variables were predictors of success at different points of time during the project life cycle. Practical applications of these results along with limitations and future research are described.
    publisherAmerican Society of Civil Engineers
    titleContinuous Assessment of Project Performance
    typeJournal Paper
    journal volume123
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1997)123:1(64)
    treeJournal of Construction Engineering and Management:;1997:;Volume ( 123 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian