YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Electrical Construction Foreman Task Scheduling

    Source: Journal of Construction Engineering and Management:;1996:;Volume ( 122 ):;issue: 004
    Author:
    Bolivar A. Senior
    DOI: 10.1061/(ASCE)0733-9364(1996)122:4(363)
    Publisher: American Society of Civil Engineers
    Abstract: The short-term task scheduling of electrical foremen working in commercial and institutional construction projects was evaluated using a combination of interviews, questionnaires, and field observations. The planning environment was evaluated qualitatively, including the project and firm size, availability of resources, planning horizon, and issuing of directives. The quantitative analysis of factors presumed to affect the scheduling was emphasized in the investigation. These factors included task duration, criticality, likelihood of problems during execution, actual problems, and offset in planned start. This investigation found that foremen had almost complete authority over their daily crew task assignments. The favored planning span to articulate an explicit schedule was the workweek. Labor availability was more constraining than material supply in the formulation of the schedule. Directives were verbally issued in all observed cases. Analysis of scheduling parameters showed that dependence on other subcontractors' progress was the most common source of problems, and that problems acted as uniform background noise in the scheduling accuracy. Short and near tasks were the easiest to schedule. Some tasks were categorized as “fillers,” used to achieve continuity in labor utilization.
    • Download: (992.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Electrical Construction Foreman Task Scheduling

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/84045
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorBolivar A. Senior
    date accessioned2017-05-08T22:37:14Z
    date available2017-05-08T22:37:14Z
    date copyrightDecember 1996
    date issued1996
    identifier other%28asce%290733-9364%281996%29122%3A4%28363%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/84045
    description abstractThe short-term task scheduling of electrical foremen working in commercial and institutional construction projects was evaluated using a combination of interviews, questionnaires, and field observations. The planning environment was evaluated qualitatively, including the project and firm size, availability of resources, planning horizon, and issuing of directives. The quantitative analysis of factors presumed to affect the scheduling was emphasized in the investigation. These factors included task duration, criticality, likelihood of problems during execution, actual problems, and offset in planned start. This investigation found that foremen had almost complete authority over their daily crew task assignments. The favored planning span to articulate an explicit schedule was the workweek. Labor availability was more constraining than material supply in the formulation of the schedule. Directives were verbally issued in all observed cases. Analysis of scheduling parameters showed that dependence on other subcontractors' progress was the most common source of problems, and that problems acted as uniform background noise in the scheduling accuracy. Short and near tasks were the easiest to schedule. Some tasks were categorized as “fillers,” used to achieve continuity in labor utilization.
    publisherAmerican Society of Civil Engineers
    titleElectrical Construction Foreman Task Scheduling
    typeJournal Paper
    journal volume122
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1996)122:4(363)
    treeJournal of Construction Engineering and Management:;1996:;Volume ( 122 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian