YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Optimum Equipment Life by Minimum Life‐Cycle Costs

    Source: Journal of Construction Engineering and Management:;1984:;Volume ( 110 ):;issue: 002
    Author:
    Courtland A. Collier
    ,
    David E. Jacques
    DOI: 10.1061/(ASCE)0733-9364(1984)110:2(248)
    Publisher: American Society of Civil Engineers
    Abstract: A minimum cost equipment replacement model based on the present worth of discounted‐cash‐flow is presented. The model uses arithmetic and geometric gradients to project the expected life cycle costs of the existing machine plus future replacements to an infinite horizon and then discounts them back to present value. Trial life spans of the existing unit, plus future replacement units, are then ranged until the combination which yields the minimum present value of total costs is determined. The general methodology is reviewed and its application illustrated with a sample problem.
    • Download: (963.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Optimum Equipment Life by Minimum Life‐Cycle Costs

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/83945
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorCourtland A. Collier
    contributor authorDavid E. Jacques
    date accessioned2017-05-08T22:37:05Z
    date available2017-05-08T22:37:05Z
    date copyrightMarch 1984
    date issued1984
    identifier other%28asce%290733-9364%281984%29110%3A2%28248%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/83945
    description abstractA minimum cost equipment replacement model based on the present worth of discounted‐cash‐flow is presented. The model uses arithmetic and geometric gradients to project the expected life cycle costs of the existing machine plus future replacements to an infinite horizon and then discounts them back to present value. Trial life spans of the existing unit, plus future replacement units, are then ranged until the combination which yields the minimum present value of total costs is determined. The general methodology is reviewed and its application illustrated with a sample problem.
    publisherAmerican Society of Civil Engineers
    titleOptimum Equipment Life by Minimum Life‐Cycle Costs
    typeJournal Paper
    journal volume110
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1984)110:2(248)
    treeJournal of Construction Engineering and Management:;1984:;Volume ( 110 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian