YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Project Scheduling Using Fuzzy Set Concepts

    Source: Journal of Construction Engineering and Management:;1984:;Volume ( 110 ):;issue: 002
    Author:
    Bilal M. Ayyub
    ,
    Achintya Haldar
    DOI: 10.1061/(ASCE)0733-9364(1984)110:2(189)
    Publisher: American Society of Civil Engineers
    Abstract: Probabilistic methods are being used increasingly in construction engineering. However, when a parameter is expressed in linguistic rather than mathematical terms, classical probability theory fails to incorporate the information. The linguistic variables can be translated into mathematical measures using fuzzy set and system theory. A construction management problem, i.e., estimation of the duration of an activity, is solved using this theory. In order to implement the proposed technique, various membership functions need to be estimated using judgment or with the assistance of experts. The proposed technique is not sensitive to small variations in the membership values. This is a very desirable property. However, the method is sensitive to the choice of the fuzzy relations. The uncertainty in the fuzzy relations can be modeled along with other sources of uncertainty. The mean and variance of the parameters involved in the problem under consideration are estimated here using a new method. The method maximizes the product of the sum of the membership associations for a certain frequency of occurrence and the corresponding frequency of occurrence. One of the main advantages of the proposed technique is that it can be easily implemented in existing computer programs for project scheduling.
    • Download: (794.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Project Scheduling Using Fuzzy Set Concepts

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/83500
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorBilal M. Ayyub
    contributor authorAchintya Haldar
    date accessioned2017-05-08T22:36:18Z
    date available2017-05-08T22:36:18Z
    date copyrightMarch 1984
    date issued1984
    identifier other%28asce%290733-9364%281984%29110%3A2%28189%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/83500
    description abstractProbabilistic methods are being used increasingly in construction engineering. However, when a parameter is expressed in linguistic rather than mathematical terms, classical probability theory fails to incorporate the information. The linguistic variables can be translated into mathematical measures using fuzzy set and system theory. A construction management problem, i.e., estimation of the duration of an activity, is solved using this theory. In order to implement the proposed technique, various membership functions need to be estimated using judgment or with the assistance of experts. The proposed technique is not sensitive to small variations in the membership values. This is a very desirable property. However, the method is sensitive to the choice of the fuzzy relations. The uncertainty in the fuzzy relations can be modeled along with other sources of uncertainty. The mean and variance of the parameters involved in the problem under consideration are estimated here using a new method. The method maximizes the product of the sum of the membership associations for a certain frequency of occurrence and the corresponding frequency of occurrence. One of the main advantages of the proposed technique is that it can be easily implemented in existing computer programs for project scheduling.
    publisherAmerican Society of Civil Engineers
    titleProject Scheduling Using Fuzzy Set Concepts
    typeJournal Paper
    journal volume110
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1984)110:2(189)
    treeJournal of Construction Engineering and Management:;1984:;Volume ( 110 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian