YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Enforcement of Liquidated Damages

    Source: Journal of Construction Engineering and Management:;1995:;Volume ( 121 ):;issue: 004
    Author:
    H. Randolph Thomas
    ,
    Gary R. Smith
    ,
    Daniel J. Cummings
    DOI: 10.1061/(ASCE)0733-9364(1995)121:4(459)
    Publisher: American Society of Civil Engineers
    Abstract: This paper reviews the rules related to the enforcement of the contract liquidated-damages clause. The literature indicates that the clause will be enforced if: (1) The daily amount bears some resemblance to the actual damages that could be reasonably foreseen at the time the contract was written; and (2) the damage amount is difficult or impossible to estimate. Related to the reasonableness issue, courts will not permit the owner to use the clause to unreasonably coerce the contractor to complete the project on time or punish the contractor if he or she is late. The issue of difficulty in estimating the potential damages seems to be relatively minor. It is important that the estimates be related to the time the contract was signed. A number of cases were found where the actual damages were considerably more or less than the liquidated amount. This fact did not serve to waive enforcement of the clause. This paper discusses a number of issues related to liquidated damages and the assistance of an attorney may be needed.
    • Download: (686.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Enforcement of Liquidated Damages

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/83467
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorH. Randolph Thomas
    contributor authorGary R. Smith
    contributor authorDaniel J. Cummings
    date accessioned2017-05-08T22:36:14Z
    date available2017-05-08T22:36:14Z
    date copyrightDecember 1995
    date issued1995
    identifier other%28asce%290733-9364%281995%29121%3A4%28459%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/83467
    description abstractThis paper reviews the rules related to the enforcement of the contract liquidated-damages clause. The literature indicates that the clause will be enforced if: (1) The daily amount bears some resemblance to the actual damages that could be reasonably foreseen at the time the contract was written; and (2) the damage amount is difficult or impossible to estimate. Related to the reasonableness issue, courts will not permit the owner to use the clause to unreasonably coerce the contractor to complete the project on time or punish the contractor if he or she is late. The issue of difficulty in estimating the potential damages seems to be relatively minor. It is important that the estimates be related to the time the contract was signed. A number of cases were found where the actual damages were considerably more or less than the liquidated amount. This fact did not serve to waive enforcement of the clause. This paper discusses a number of issues related to liquidated damages and the assistance of an attorney may be needed.
    publisherAmerican Society of Civil Engineers
    titleEnforcement of Liquidated Damages
    typeJournal Paper
    journal volume121
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1995)121:4(459)
    treeJournal of Construction Engineering and Management:;1995:;Volume ( 121 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian