YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Debt Capacity and Optimal Capital Structure for Privately Financed Infrastructure Projects

    Source: Journal of Construction Engineering and Management:;1995:;Volume ( 121 ):;issue: 004
    Author:
    Antonio Dias Jr.
    ,
    Photios G. Ioannou
    DOI: 10.1061/(ASCE)0733-9364(1995)121:4(404)
    Publisher: American Society of Civil Engineers
    Abstract: Concession agreements can be used by governments to induce the private sector to develop and operate many types of infrastructure projects. Under this type of arrangement, several private-sector companies join forces, become project promoters, and form a separate company that becomes responsible for financing, building, and operating the facility. Before this company can be formed, prospective promoters must determine how to fund the associated construction and startup costs. They must decide how much to borrow, how much to infuse from their own funds, and how much to raise from outside investors. Typically, such projects must repay any debt obligations through their own net operating income, and do not provide the lenders with any other collateral (off-balance-sheet financing). Thus, the possibility of a costly bankruptcy becomes much more likely. In this paper, we show that under these circumstances the amount of debt that a project can accommodate (its debt capacity) is less than 100% debt financing. The amount of debt that maximizes the investors' return on equity is less than the project's debt capacity, and the amount of debt that maximizes the project's net present value is even smaller. Exceeding these debt amounts and moving towards debt capacity should be avoided because it can rapidly erode the project's value to the investors. An example illustrates these concepts.
    • Download: (1.447Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Debt Capacity and Optimal Capital Structure for Privately Financed Infrastructure Projects

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/83390
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorAntonio Dias Jr.
    contributor authorPhotios G. Ioannou
    date accessioned2017-05-08T22:36:05Z
    date available2017-05-08T22:36:05Z
    date copyrightDecember 1995
    date issued1995
    identifier other%28asce%290733-9364%281995%29121%3A4%28404%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/83390
    description abstractConcession agreements can be used by governments to induce the private sector to develop and operate many types of infrastructure projects. Under this type of arrangement, several private-sector companies join forces, become project promoters, and form a separate company that becomes responsible for financing, building, and operating the facility. Before this company can be formed, prospective promoters must determine how to fund the associated construction and startup costs. They must decide how much to borrow, how much to infuse from their own funds, and how much to raise from outside investors. Typically, such projects must repay any debt obligations through their own net operating income, and do not provide the lenders with any other collateral (off-balance-sheet financing). Thus, the possibility of a costly bankruptcy becomes much more likely. In this paper, we show that under these circumstances the amount of debt that a project can accommodate (its debt capacity) is less than 100% debt financing. The amount of debt that maximizes the investors' return on equity is less than the project's debt capacity, and the amount of debt that maximizes the project's net present value is even smaller. Exceeding these debt amounts and moving towards debt capacity should be avoided because it can rapidly erode the project's value to the investors. An example illustrates these concepts.
    publisherAmerican Society of Civil Engineers
    titleDebt Capacity and Optimal Capital Structure for Privately Financed Infrastructure Projects
    typeJournal Paper
    journal volume121
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1995)121:4(404)
    treeJournal of Construction Engineering and Management:;1995:;Volume ( 121 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian