YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Proposed Design Provisions for a Seamless Bridge System: Cases of Flexible and Jointed Pavements

    Source: Journal of Bridge Engineering:;2016:;Volume ( 021 ):;issue: 002
    Author:
    Nima
    ,
    Ala
    ,
    Atorod
    ,
    Azizinamini
    DOI: 10.1061/(ASCE)BE.1943-5592.0000750
    Publisher: American Society of Civil Engineers
    Abstract: Expansion devices are one of the main causes for high maintenance costs in bridges. In this paper, a seamless bridge system is presented that results in bridges with long service lives by eliminating the joints over the bridge length, approach slab, and a segment of the roadway. The idea of a seamless system was originally developed in Australia for use with continuously reinforced concrete pavements (CRCP). In this system, bridge movements are dissipated in the transition zone located at the bridge ends beyond the bridge abutments. Thermal compression forces are transferred partly to base soil and partly to the CRCP, and the thermal contractions are handled by opening and closing microcracks in the transition zone. Crack width and spacing are important parameters in the design of seamless bridge systems. This paper presents the modification to the Australian seamless system so that it could be extended to U.S. practice, where most pavements are either jointed plain concrete or flexible. Analyses and design procedures are presented. The main difference between the Australian version of the seamless system and the proposed version for U.S. practice is in the type of transition region. The main challenge for U.S. practice is to have almost zero movement and force at the end of the transition zone. This objective is achieved by constructing a secondary slab below the transition region and connecting the two using closely spaced small piles. Numerical and analytical studies have been carried out to comprehend the performance of the proposed system, and an experimental study was carried out to provide proof of the concept and merits of the proposed design recommendations. Results of this experimental work are presented elsewhere.
    • Download: (2.275Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Proposed Design Provisions for a Seamless Bridge System: Cases of Flexible and Jointed Pavements

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/83204
    Collections
    • Journal of Bridge Engineering

    Show full item record

    contributor authorNima
    contributor authorAla
    contributor authorAtorod
    contributor authorAzizinamini
    date accessioned2017-05-08T22:35:34Z
    date available2017-05-08T22:35:34Z
    date copyrightFebruary 2016
    date issued2016
    identifier other50904872.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/83204
    description abstractExpansion devices are one of the main causes for high maintenance costs in bridges. In this paper, a seamless bridge system is presented that results in bridges with long service lives by eliminating the joints over the bridge length, approach slab, and a segment of the roadway. The idea of a seamless system was originally developed in Australia for use with continuously reinforced concrete pavements (CRCP). In this system, bridge movements are dissipated in the transition zone located at the bridge ends beyond the bridge abutments. Thermal compression forces are transferred partly to base soil and partly to the CRCP, and the thermal contractions are handled by opening and closing microcracks in the transition zone. Crack width and spacing are important parameters in the design of seamless bridge systems. This paper presents the modification to the Australian seamless system so that it could be extended to U.S. practice, where most pavements are either jointed plain concrete or flexible. Analyses and design procedures are presented. The main difference between the Australian version of the seamless system and the proposed version for U.S. practice is in the type of transition region. The main challenge for U.S. practice is to have almost zero movement and force at the end of the transition zone. This objective is achieved by constructing a secondary slab below the transition region and connecting the two using closely spaced small piles. Numerical and analytical studies have been carried out to comprehend the performance of the proposed system, and an experimental study was carried out to provide proof of the concept and merits of the proposed design recommendations. Results of this experimental work are presented elsewhere.
    publisherAmerican Society of Civil Engineers
    titleProposed Design Provisions for a Seamless Bridge System: Cases of Flexible and Jointed Pavements
    typeJournal Paper
    journal volume21
    journal issue2
    journal titleJournal of Bridge Engineering
    identifier doi10.1061/(ASCE)BE.1943-5592.0000750
    treeJournal of Bridge Engineering:;2016:;Volume ( 021 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian