YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Prioritizing Interrelated Road Projects Using Metaheuristics

    Source: Journal of Infrastructure Systems:;2016:;Volume ( 022 ):;issue: 002
    Author:
    Elham Shayanfar
    ,
    Arezoo Samimi Abianeh
    ,
    Paul Schonfeld
    ,
    Lei Zhang
    DOI: 10.1061/(ASCE)IS.1943-555X.0000293
    Publisher: American Society of Civil Engineers
    Abstract: Projects are considered interrelated when their benefits or costs depend on which other projects are implemented. The timing of such projects may also complicate their analysis. Selection and scheduling of interrelated projects is a challenging optimization problem that has many applications in various fields, including economics, operations research, business, management, and transportation. The goal is to determine which projects should be selected and when they should be funded in order to minimize the total system cost over a planning horizon. Finding the optimal solution for such problems often requires extensive evaluation of possible solutions because of the complex nature and noisy surface of their solution space. This paper applies three metaheuristic algorithms including a genetic algorithm (GA), simulated annealing (SA), and Tabu search (TS) in seeking efficient and consistent solutions to the selection and scheduling problem. These approaches are applied to a special case of link capacity expansion projects to showcase their functionality and compare their performance. The paper’s main contributions are to (1) compare three metaheuristics for this problem in terms of solution quality, computation time, and consistency; (2) consider explicitly the supplier costs as well as user costs in the formulated objective function; and (3) enhance some simplifying assumptions from previous studies by recognizing that candidate projects may not remain economically justifiable throughout the analyzed period. It is found that a GA yields the most consistent solution with the least total cost while SA and TS approaches excel in terms of computation time.
    • Download: (751.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Prioritizing Interrelated Road Projects Using Metaheuristics

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/82868
    Collections
    • Journal of Infrastructure Systems

    Show full item record

    contributor authorElham Shayanfar
    contributor authorArezoo Samimi Abianeh
    contributor authorPaul Schonfeld
    contributor authorLei Zhang
    date accessioned2017-05-08T22:34:21Z
    date available2017-05-08T22:34:21Z
    date copyrightJune 2016
    date issued2016
    identifier other49982572.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/82868
    description abstractProjects are considered interrelated when their benefits or costs depend on which other projects are implemented. The timing of such projects may also complicate their analysis. Selection and scheduling of interrelated projects is a challenging optimization problem that has many applications in various fields, including economics, operations research, business, management, and transportation. The goal is to determine which projects should be selected and when they should be funded in order to minimize the total system cost over a planning horizon. Finding the optimal solution for such problems often requires extensive evaluation of possible solutions because of the complex nature and noisy surface of their solution space. This paper applies three metaheuristic algorithms including a genetic algorithm (GA), simulated annealing (SA), and Tabu search (TS) in seeking efficient and consistent solutions to the selection and scheduling problem. These approaches are applied to a special case of link capacity expansion projects to showcase their functionality and compare their performance. The paper’s main contributions are to (1) compare three metaheuristics for this problem in terms of solution quality, computation time, and consistency; (2) consider explicitly the supplier costs as well as user costs in the formulated objective function; and (3) enhance some simplifying assumptions from previous studies by recognizing that candidate projects may not remain economically justifiable throughout the analyzed period. It is found that a GA yields the most consistent solution with the least total cost while SA and TS approaches excel in terms of computation time.
    publisherAmerican Society of Civil Engineers
    titlePrioritizing Interrelated Road Projects Using Metaheuristics
    typeJournal Paper
    journal volume22
    journal issue2
    journal titleJournal of Infrastructure Systems
    identifier doi10.1061/(ASCE)IS.1943-555X.0000293
    treeJournal of Infrastructure Systems:;2016:;Volume ( 022 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian