YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    An Integer Linear Programming Model for the Multiperiod Production Planning of Precast Concrete Beams

    Source: Journal of Construction Engineering and Management:;2015:;Volume ( 141 ):;issue: 010
    Author:
    Bruno de Athayde Prata
    ,
    Anselmo Ramalho Pitombeira-Neto
    ,
    Caio Jucá de Moraes Sales
    DOI: 10.1061/(ASCE)CO.1943-7862.0000991
    Publisher: American Society of Civil Engineers
    Abstract: Unlike conventional beams, which are cast in the construction site, precast beams are cast in a production line in a beam factory. Their use may considerably reduce the completion time of construction projects, making them attractive to public housing. A key factor for the success of their use is the ability of efficiently producing them, which depends on the quality of the production planning. The objective of this paper is to propose an integer linear programming model for the precast concrete beams production problem. It is first shown that this problem is isomorphic to the well-known multiperiod cutting stock problem. The objective function is the minimization of the production loss of a production order, subject to the available capacity of forms used to cast the beams. A case study is presented with data of a real scale instance, so as to demonstrate the applicability of the model in industrial settings. The proposed model was implemented and ran on the CPLEX solver, which reached an optimal solution within an acceptable running time. The results indicate that significant gains may be achieved in terms of reduction of planning time through the application of the proposed model.
    • Download: (268.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      An Integer Linear Programming Model for the Multiperiod Production Planning of Precast Concrete Beams

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/81183
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorBruno de Athayde Prata
    contributor authorAnselmo Ramalho Pitombeira-Neto
    contributor authorCaio Jucá de Moraes Sales
    date accessioned2017-05-08T22:28:24Z
    date available2017-05-08T22:28:24Z
    date copyrightOctober 2015
    date issued2015
    identifier other46138548.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/81183
    description abstractUnlike conventional beams, which are cast in the construction site, precast beams are cast in a production line in a beam factory. Their use may considerably reduce the completion time of construction projects, making them attractive to public housing. A key factor for the success of their use is the ability of efficiently producing them, which depends on the quality of the production planning. The objective of this paper is to propose an integer linear programming model for the precast concrete beams production problem. It is first shown that this problem is isomorphic to the well-known multiperiod cutting stock problem. The objective function is the minimization of the production loss of a production order, subject to the available capacity of forms used to cast the beams. A case study is presented with data of a real scale instance, so as to demonstrate the applicability of the model in industrial settings. The proposed model was implemented and ran on the CPLEX solver, which reached an optimal solution within an acceptable running time. The results indicate that significant gains may be achieved in terms of reduction of planning time through the application of the proposed model.
    publisherAmerican Society of Civil Engineers
    titleAn Integer Linear Programming Model for the Multiperiod Production Planning of Precast Concrete Beams
    typeJournal Paper
    journal volume141
    journal issue10
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000991
    treeJournal of Construction Engineering and Management:;2015:;Volume ( 141 ):;issue: 010
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian