YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Interface-Management Process for Managing Risks in Complex Capital Projects

    Source: Journal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 002
    Author:
    Samin Shokri
    ,
    Carl T. Haas
    ,
    Ralph C. G. Haas
    ,
    Sang Hyun Lee
    DOI: 10.1061/(ASCE)CO.1943-7862.0000990
    Publisher: American Society of Civil Engineers
    Abstract: Extremely large, complex projects with numerous geographically distributed stakeholders experience substantial risks related to the interfaces among stakeholders. This is particularly true during project definition and design, where despite discrete deliverables across the interfaces, decisions require some iteration. Managing interfaces has become feasible with the advent of internet and electronic product and process-management systems to the extent that full-time interface-management (IM) positions exist in practice. However, IM lacks formal structure, integration with critical-path-method scheduling, and methods to identify high-risk interface points (IPs). Throughout this paper, a graph-based algorithm is developed to identify key IPs in the network of IPs in a capital project. Furthermore, a new approach is discussed to link the key IPs to the interface milestones to identify schedule-related risks and mitigate their adverse impact. The functionality of the proposed algorithms is demonstrated in an offshore model project. The contributions of this paper provide foundational material for further research in IM.
    • Download: (2.891Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Interface-Management Process for Managing Risks in Complex Capital Projects

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/80855
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorSamin Shokri
    contributor authorCarl T. Haas
    contributor authorRalph C. G. Haas
    contributor authorSang Hyun Lee
    date accessioned2017-05-08T22:27:10Z
    date available2017-05-08T22:27:10Z
    date copyrightFebruary 2016
    date issued2016
    identifier other45497739.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/80855
    description abstractExtremely large, complex projects with numerous geographically distributed stakeholders experience substantial risks related to the interfaces among stakeholders. This is particularly true during project definition and design, where despite discrete deliverables across the interfaces, decisions require some iteration. Managing interfaces has become feasible with the advent of internet and electronic product and process-management systems to the extent that full-time interface-management (IM) positions exist in practice. However, IM lacks formal structure, integration with critical-path-method scheduling, and methods to identify high-risk interface points (IPs). Throughout this paper, a graph-based algorithm is developed to identify key IPs in the network of IPs in a capital project. Furthermore, a new approach is discussed to link the key IPs to the interface milestones to identify schedule-related risks and mitigate their adverse impact. The functionality of the proposed algorithms is demonstrated in an offshore model project. The contributions of this paper provide foundational material for further research in IM.
    publisherAmerican Society of Civil Engineers
    titleInterface-Management Process for Managing Risks in Complex Capital Projects
    typeJournal Paper
    journal volume142
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000990
    treeJournal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian