YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Late Deliverable Risk Catalog: Evaluating the Impacts and Risks of Late Deliverables to Construction Sites

    Source: Journal of Construction Engineering and Management:;2015:;Volume ( 141 ):;issue: 004
    Author:
    William Barry
    ,
    Fernanda Leite
    ,
    William J. O’Brien
    DOI: 10.1061/(ASCE)CO.1943-7862.0000950
    Publisher: American Society of Civil Engineers
    Abstract: The Construction Industry Institute (CII) Research Team (RT) 300, a collaborative effort between CII and the Construction Users Roundtable (CURT), was chartered to define and document the full range of impacts that late deliverables to construction can have on a project, and to better understand the far-reaching impacts of late deliverables at the construction site. Towards these goals, RT 300 developed the late deliverable risk catalog (LDRC) to organize and display the data collected through academic literature, industry surveys and questionnaires, and project case studies. To accompany the LDRC, RT 300 has also developed (1) an overview of the LDRC with suggested implementation strategies, (2) example applications of the research reported in this paper, (3) prevention recommendations for the most common late deliverables, and (4) lessons learned in managing late deliverables and mitigating their impacts. These topics have all been included in this paper to help the construction industry leverage the knowledge developed in the research reported in this paper into improved cost, schedule, safety, quality, and organizational performance through a greater understanding of risks associated with late deliverables to construction.
    • Download: (11.36Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Late Deliverable Risk Catalog: Evaluating the Impacts and Risks of Late Deliverables to Construction Sites

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/78749
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorWilliam Barry
    contributor authorFernanda Leite
    contributor authorWilliam J. O’Brien
    date accessioned2017-05-08T22:21:53Z
    date available2017-05-08T22:21:53Z
    date copyrightApril 2015
    date issued2015
    identifier other43394318.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/78749
    description abstractThe Construction Industry Institute (CII) Research Team (RT) 300, a collaborative effort between CII and the Construction Users Roundtable (CURT), was chartered to define and document the full range of impacts that late deliverables to construction can have on a project, and to better understand the far-reaching impacts of late deliverables at the construction site. Towards these goals, RT 300 developed the late deliverable risk catalog (LDRC) to organize and display the data collected through academic literature, industry surveys and questionnaires, and project case studies. To accompany the LDRC, RT 300 has also developed (1) an overview of the LDRC with suggested implementation strategies, (2) example applications of the research reported in this paper, (3) prevention recommendations for the most common late deliverables, and (4) lessons learned in managing late deliverables and mitigating their impacts. These topics have all been included in this paper to help the construction industry leverage the knowledge developed in the research reported in this paper into improved cost, schedule, safety, quality, and organizational performance through a greater understanding of risks associated with late deliverables to construction.
    publisherAmerican Society of Civil Engineers
    titleLate Deliverable Risk Catalog: Evaluating the Impacts and Risks of Late Deliverables to Construction Sites
    typeJournal Paper
    journal volume141
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000950
    treeJournal of Construction Engineering and Management:;2015:;Volume ( 141 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian