YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Productivity Gains in a Line Flow Precast Concrete Process after a Basic Stability Effort

    Source: Journal of Construction Engineering and Management:;2014:;Volume ( 140 ):;issue: 004
    Author:
    Carlos Antonio Samaniego Gallardo
    ,
    Ariovaldo Denis Granja
    ,
    Flavio Augusto Picchi
    DOI: 10.1061/(ASCE)CO.1943-7862.0000728
    Publisher: American Society of Civil Engineers
    Abstract: Lean principles and methods have been successfully applied to precast concrete job shops and batch flows. The conversion of processes from batch flow environments to line flow environments is the main reason for the productivity gains that have been reported in the literature. By means of an action-research approach rooted in the philosophy of lean thinking, the authors show that further productivity gains are possible for precast concrete fabrication processes already running in line flow. This study took place at a company that had previously implemented lean measures, such as value stream mapping (VSM), workplace organization (5S Method), pull systems, and total productive maintenance (TPM). This earlier initiative provided productivity gains, although in a variable and unsustained way. The research approach could devise a simple stability process with a focus on method and manpower. After a series of improvement cycles, the production process achieved almost complete stability and obtained an additional productivity gain of 24%. These results suggest that neglecting stability issues in lean implementations means wasting part of the potential gains, in addition to risking the loss of previously obtained gains, even in environments apparently optimized for line flow.
    • Download: (1.472Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Productivity Gains in a Line Flow Precast Concrete Process after a Basic Stability Effort

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/78365
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorCarlos Antonio Samaniego Gallardo
    contributor authorAriovaldo Denis Granja
    contributor authorFlavio Augusto Picchi
    date accessioned2017-05-08T22:21:00Z
    date available2017-05-08T22:21:00Z
    date copyrightApril 2014
    date issued2014
    identifier other42773378.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/78365
    description abstractLean principles and methods have been successfully applied to precast concrete job shops and batch flows. The conversion of processes from batch flow environments to line flow environments is the main reason for the productivity gains that have been reported in the literature. By means of an action-research approach rooted in the philosophy of lean thinking, the authors show that further productivity gains are possible for precast concrete fabrication processes already running in line flow. This study took place at a company that had previously implemented lean measures, such as value stream mapping (VSM), workplace organization (5S Method), pull systems, and total productive maintenance (TPM). This earlier initiative provided productivity gains, although in a variable and unsustained way. The research approach could devise a simple stability process with a focus on method and manpower. After a series of improvement cycles, the production process achieved almost complete stability and obtained an additional productivity gain of 24%. These results suggest that neglecting stability issues in lean implementations means wasting part of the potential gains, in addition to risking the loss of previously obtained gains, even in environments apparently optimized for line flow.
    publisherAmerican Society of Civil Engineers
    titleProductivity Gains in a Line Flow Precast Concrete Process after a Basic Stability Effort
    typeJournal Paper
    journal volume140
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000728
    treeJournal of Construction Engineering and Management:;2014:;Volume ( 140 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian