YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Construction of Ameria Caisson in Egypt

    Source: Journal of Construction Engineering and Management:;1995:;Volume ( 121 ):;issue: 001
    Author:
    Ismail M. Basha
    ,
    Ahmed A. Gab-Allah
    ,
    Mohamed I. Amer
    DOI: 10.1061/(ASCE)0733-9364(1995)121:1(13)
    Publisher: American Society of Civil Engineers
    Abstract: The Ameria Tunnel Pumping Station (ATPS) is the main pumping station of the Greater Cairo Wastewater Project. The objective of ATPS is to lift the wastewater for a vertical distance of 32.0 m (from the collection tunnel at approximate mean sea level (MSL) of −14.0 m, to box culverts at ground level, +18.0 m MSL) to continue the flow under gravity to the final treatment plant. The ATPS contains eight huge centrifugal pumps, each with a lifting capacity of 3,600 L/s. It is considered one of the highly technological civil engineering works in Egypt, probably the largest installation of its kind in the world. This paper outlines the construction method used to carry out various work elements of such a large civil engineering project. The problems encountered during construction (mainly due to the soil structure and characteristics), and the solutions innovated for these problems are also presented. A call is made for extensive soil investigation to minimize uncertainty and problems during future underground constructions.
    • Download: (485.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Construction of Ameria Caisson in Egypt

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/77841
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorIsmail M. Basha
    contributor authorAhmed A. Gab-Allah
    contributor authorMohamed I. Amer
    date accessioned2017-05-08T22:19:50Z
    date available2017-05-08T22:19:50Z
    date copyrightMarch 1995
    date issued1995
    identifier other%28asce%290733-9364%281995%29121%3A1%2813%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/77841
    description abstractThe Ameria Tunnel Pumping Station (ATPS) is the main pumping station of the Greater Cairo Wastewater Project. The objective of ATPS is to lift the wastewater for a vertical distance of 32.0 m (from the collection tunnel at approximate mean sea level (MSL) of −14.0 m, to box culverts at ground level, +18.0 m MSL) to continue the flow under gravity to the final treatment plant. The ATPS contains eight huge centrifugal pumps, each with a lifting capacity of 3,600 L/s. It is considered one of the highly technological civil engineering works in Egypt, probably the largest installation of its kind in the world. This paper outlines the construction method used to carry out various work elements of such a large civil engineering project. The problems encountered during construction (mainly due to the soil structure and characteristics), and the solutions innovated for these problems are also presented. A call is made for extensive soil investigation to minimize uncertainty and problems during future underground constructions.
    publisherAmerican Society of Civil Engineers
    titleConstruction of Ameria Caisson in Egypt
    typeJournal Paper
    journal volume121
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1995)121:1(13)
    treeJournal of Construction Engineering and Management:;1995:;Volume ( 121 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian