YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Have I Reached Substantial Completion?

    Source: Journal of Construction Engineering and Management:;1995:;Volume ( 121 ):;issue: 001
    Author:
    H. Randolph Thomas
    ,
    Gary R. Smith
    ,
    Daniel J. Cummings
    DOI: 10.1061/(ASCE)0733-9364(1995)121:1(121)
    Publisher: American Society of Civil Engineers
    Abstract: This paper reviews the important issues related to determining if substantial completion of a construction project has been reached. This milestone is important because it means that the contractor is entitled to the release of retainage, less deductions for uncompleted work. Because the owner has the right to occupy and use the facility, there can be no breach of contract beyond this point in time because of late completion. Liquidated damages cannot be assessed beyond substantial completion. Equipment warranties also take effect. Four questions are addressed: Was the purpose of the project defeated? Did the owner benefit from using the project? How extensive are the defects? And, how easy are the defects to correct? Of these questions, the principle one is whether the purpose of the project was defeated. If no, or if the owner benefitted from the work, substantial completion has likely been achieved. Several examples are given.
    • Download: (911.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Have I Reached Substantial Completion?

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/77730
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorH. Randolph Thomas
    contributor authorGary R. Smith
    contributor authorDaniel J. Cummings
    date accessioned2017-05-08T22:19:35Z
    date available2017-05-08T22:19:35Z
    date copyrightMarch 1995
    date issued1995
    identifier other%28asce%290733-9364%281995%29121%3A1%28121%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/77730
    description abstractThis paper reviews the important issues related to determining if substantial completion of a construction project has been reached. This milestone is important because it means that the contractor is entitled to the release of retainage, less deductions for uncompleted work. Because the owner has the right to occupy and use the facility, there can be no breach of contract beyond this point in time because of late completion. Liquidated damages cannot be assessed beyond substantial completion. Equipment warranties also take effect. Four questions are addressed: Was the purpose of the project defeated? Did the owner benefit from using the project? How extensive are the defects? And, how easy are the defects to correct? Of these questions, the principle one is whether the purpose of the project was defeated. If no, or if the owner benefitted from the work, substantial completion has likely been achieved. Several examples are given.
    publisherAmerican Society of Civil Engineers
    titleHave I Reached Substantial Completion?
    typeJournal Paper
    journal volume121
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1995)121:1(121)
    treeJournal of Construction Engineering and Management:;1995:;Volume ( 121 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian