YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Incentive/Disincentive Guidelines for Highway Construction Contracts

    Source: Journal of Construction Engineering and Management:;1995:;Volume ( 121 ):;issue: 001
    Author:
    Majid Jaraiedi
    ,
    Ralph W. Plummer
    ,
    Mary S. Aber
    DOI: 10.1061/(ASCE)0733-9364(1995)121:1(112)
    Publisher: American Society of Civil Engineers
    Abstract: Contract incentives have traditionally been used as a means of aligning the goals of the contracting agency with those of the contractor. One area in which contract incentives are used is highway construction and refurbishing. The use of incentives and disincentives (I/Ds) for project completion time has helped highway agencies in various states to reduce construction time significantly. However, I/D provisions increase costs to the contracting agency, and should therefore be used sparingly. For these types of contracts to succeed, it is necessary for the contracting agency to be extremely careful in the development, documentation, and execution of I/D clauses. In this research, the current use of I/D contracts in many states and the experience of several contractors were examined. Then, a general set of guidelines was developed for the use of I/D provisions in highway construction or refurbishing contracts. The guidelines aid in determining which projects should contain the I/D provisions and how to structure the I/D provisions to achieve maximum success.
    • Download: (1017.Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Incentive/Disincentive Guidelines for Highway Construction Contracts

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/77619
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMajid Jaraiedi
    contributor authorRalph W. Plummer
    contributor authorMary S. Aber
    date accessioned2017-05-08T22:19:24Z
    date available2017-05-08T22:19:24Z
    date copyrightMarch 1995
    date issued1995
    identifier other%28asce%290733-9364%281995%29121%3A1%28112%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/77619
    description abstractContract incentives have traditionally been used as a means of aligning the goals of the contracting agency with those of the contractor. One area in which contract incentives are used is highway construction and refurbishing. The use of incentives and disincentives (I/Ds) for project completion time has helped highway agencies in various states to reduce construction time significantly. However, I/D provisions increase costs to the contracting agency, and should therefore be used sparingly. For these types of contracts to succeed, it is necessary for the contracting agency to be extremely careful in the development, documentation, and execution of I/D clauses. In this research, the current use of I/D contracts in many states and the experience of several contractors were examined. Then, a general set of guidelines was developed for the use of I/D provisions in highway construction or refurbishing contracts. The guidelines aid in determining which projects should contain the I/D provisions and how to structure the I/D provisions to achieve maximum success.
    publisherAmerican Society of Civil Engineers
    titleIncentive/Disincentive Guidelines for Highway Construction Contracts
    typeJournal Paper
    journal volume121
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1995)121:1(112)
    treeJournal of Construction Engineering and Management:;1995:;Volume ( 121 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian